• About

Paul Bigland

~ Blogging on transport, travel & whatever takes my fancy.

Paul Bigland

Tag Archives: Railways

Natalie Bennett’s latest ‘brain fade’, this time on Hs2

29 Sunday Mar 2015

Posted by Paul Bigland in Hs2, Natalie Bennett, The Green Party

≈ Leave a comment

Tags

Anti Hs2 mob, Green Party, Hs2, Natalie Bennett, Politics, Railways

One would have thought Green party leader Natalie Bennett might have learned lessons from her disastrous LBC ‘brain fade’ interview. But it seems not. Now she been caught bang to rights lazily re-tweeting complete & utter crap because she can’t be bothered to check her facts or learn her brief (sound familiar?)

Yesterday poor Nat re-tweeted this load of cobblers on Hs2;

Bennett

What? Hs2 ‘unlawful’? That’s one hell of a claim Natalie! I mean – you did actually read the link the the article in the Camden New Journal before retweeting this steaming pile of ordure, didn’t you?

Obviously not…

Because this is what it actually says in the CNJ:

CNJ

http://www.camdennewjournal.com/news/2015/mar/former-top-government-chief-sir-tim-lankester-brands-hs2-misuse-public-money

Yep, Sir Tim Lankester was talking about the Pergau Dam. Not Hs2! Admittedly, the error is compounded by lazy journalism as there’s a distinct lack of any end quotation marks, but the meaning should be clear to anyone with a reasonable command of English

There’s plenty on the Pergau Dam scandal in this Guardian article.

http://www.theguardian.com/global-development/2012/dec/12/pergau-dam-affair-aid-arms-scandal

In contrast, Hs2 is a project with Cross party support that’s been vetted by Parliament numerous times. The Hs2 Hybrid Bill was passed democratically by 452 MPs. To try & compare it with arms for aid is (quite frankly) stupid. Oh, and one more thing.  If Natalie Bennett’s brain wasn’t stuck in neutral yet again she might just possibly have paused & thought, ‘hang on, there’s been numerous Judicial Reviews of Hs2 – why have none of them picked this bombshell up’?

Instead, she’s let the anti Hs2 mob make her complicit in their deception -and she’s conned the 50 people who’ve either liked or re-tweeted this crap.

If the Green party want to be taken seriously in politics, either Natalie Bennett is going to have to seriously raise her game – or the Greens are going to have to find a better leader…

Hs2aa & the ‘Hs2 will cost £138bn’ deceit exposed

24 Tuesday Mar 2015

Posted by Paul Bigland in Hs2, Hs2aa, Railways, Transport

≈ 4 Comments

Tags

Anti Hs2 mob, Hs2, Hs2aa, Investment, Railways

The anti Hs2 campaign group Hs2aa like to pretend that they have more integrity than fellow travellers StopHs2 (whom they look down their noses on – especially Campaign Manager Joe Rukin, a man who’s notorious for telling porkies). The reality is – it’s a load of hypocritical nonsense – as the latest rubbish about the ‘true cost’ of Hs2 being £138bn shows in spades.

This fantasy figure was concocted by Dan Mitchell and Andrew Bodman & presented in a petition to the HS2 Select Committee on March 2nd.

Andrew Bodman is a figurehead in SNAG (South Northants Action Group) but he was parachuted into that group to stop it imploding due to its ‘managerial difficulties’ He’s actually a Director of Hs2aa (see here);
http://www.hs2actionalliance.org/about/team/

Bodman co-concocted the risible £138bn which is justified thus (taken from a StopHs2 press release) http://stophs2.org/news/13236-hidden-costs-double-hs2-bill

“The total cost of HS2 (Phases One and Two) could well reach £138 billion, maybe more. Yet the official figure is £50 billion including trains.

The largest additional amount (£30 billion) is the ongoing subsidy that is likely to be required. Only two high speed lines in the world are thought to be profitable (Paris – Lyon and Tokyo – Osaka) and it is extremely unlikely that HS2 will join that exclusive club. A subsidy will be needed to cover the interest payments on the considerable debt incurred in building this line, higher operating costs of such trains and revenues that fail to match forecasts as passenger numbers will probably turn out to be less than expected. Several countries subsidise their high speed lines by $1bn per year or more. A £0.5bn subsidy per year has been estimated over 60 years.

It also appears that the construction costs for Phase Two have been significantly understated. At present, the estimated construction cost (without contingency) of Phase One is £108m per mile while that for Phase Two is £59m per mile. By referencing the construction cost per mile for HS1, the HS2 Phase One cost per mile seems the more likely. With the current contingency for HS2 construction costs being 70%, it means the Phase Two construction cost is likely to rise from £21.2bn to £39.4bn.

The next element to be factored in is an additional power station bearing in mind how little spare generating capacity the UK has at present. Using input from electrical engineers, it is believed that an additional medium sized power station will be required to meet the demands of these powerful trains on what will be an intensively used series of lines. £16bn has been added to cover this requirement.

Furthermore Crossrail 2 will be needed at Euston to help the onward travel of rail passengers to their end destinations. The existing Underground services will be unable to cope with such significant increases of passenger numbers once HS2 Phase Two is running, and this shortcoming has been recognised by Transport for London. We have suggested a £7bn contribution to Crossrail 2 which is approximately a quarter of its total estimated cost to ensure that this work proceeds, and in a timely fashion.

Currently there is no research and development budget for HS2 which seems extraordinary when the plan is to run trains faster than in most other countries and more intensively between London and Birmingham than on any other high speed line in the world. There are many issues needing investigation including electrical engineering, vibration, sound and other speed related issues. A nominal £5bn for research and development has been added.

Other areas that have been added include security, track maintenance and upgrading the overhead line equipment on sections of the West Coast Mainline and East Coast Mainline (used by classic compatible HS2 trains) to provide improved reliability.

There are a number of costs associated with HS2 which cannot be readily costed at this stage, e.g. the HS2 Growth Taskforce Schemes for getting cities HS2 ready.

In addition there are concerns that some of the contingency amounts may be insufficient bearing in mind the recent cost increases which have occurred on the Great Western and other electrification programmes. The cost of the Great Western Electrification programme has gone up by 70% in the latter half of 2014 alone and 180% since first conceived, while the cost of each connection to the National Grid has increased by 150%.

Dan Mitchell said he was concerned that Parliament was currently being misled as are taxpayers. He is very aware that the Public Accounts Committee and Major Projects Authority also have serious concerns regarding the cost of this significant project. Dan Mitchell has also said that £138 billion is a disproportionate amount of money to spend on a single project. He believes there are other more pressing issues to address on the rail network.”

Let’s dissect these claims, shall we…?

“Ongoing subsidy over 60 years – £30bn.”
As the Hybrid Bill Committee very promptly picked up, other countries make policy decisions to subsidise their railways more than we do. But that’s just one reason why alleging that HS2 will need a subsidy on the basis of international comparisons is invalid.

First, our InterCity trunk routes serving the markets that HS2 will work in now pay premiums to the DfT for their franchises, so why should HS2 not do the same? Then, our high speed line will be used more intensively than those abroad, so will have more trains earning money on its infrastructure to share the cost.

As to the expected figures, the “Economic Case for HS2” in Table 15 shows a Present Value (that is, figures for every year of the project life rolled into one) of operating costs of £22.1 billion, and a Present Value for fares revenue of £31.1 billion. So, far from requiring a subsidy, over the project life fares will exceed operating costs by a total of £9 billion.

“Phase Two construction cost correction – £18.2 bn”
No, it is not valid to estimate the Phase 2 cost from Phase 1, as Phase 1 has more of the expensive items such as stations – not just Euston but also Old Oak Common, Birmingham Interchange with its 4-track section and complex junctions, and Birmingham Curzon Street – and tunnels. By comparison, Phase 2 is a relatively simple job, with less in the way of additional stations, tunnelling and complex junctions relative to its length.

“Crossrail 2 contribution – £7 bn”
Not this old chestnut again! TfL have stated clearly that they regard Crossrail 2 as essential for London full stop. It simply makes sense to construct its station box at Euston/Kings Cross at the same time as Euston is being rebuilt. If anyone could identify a true incremental cost imposed by HS2 they might have a point, but no-one has.

The £7 bn suggested to be charged to HS2 is not only arbitrary but a paper transfer, as it would just make the funding requirement for Crossrail2 £7 bn lower and leave total UK spending exactly where it would have been. But if you insist, just remember when charging HS2 with a quarter of the cost, to credit HS2 with a quarter of the benefits. And that means that effect on the HS2 BCR is zilch.

“Research and Development – £5bn”
This is pure fantasy. When did BR ever spend that much on research, whilst developing pioneering technologies such as Solid State Interlocking for signalling systems? And just for once we are learning from the high speed pioneers, rather than making the mistakes that others then learn from. HS2 is based around proven, off the shelf technology.

“Maintenance of track – £3.36 bn”
No, this has not been forgotten. Maintenance of the HS2 infrastructure, and the track access charge to pay Network rail to maintain theirs, are both in the calculated operating costs.

“Upgraded overhead line equipment WCML and ECML – £2 bn”
Well even if this isn’t just plucked out of the air, and not already counted in the capital costs, its benefits will be shared by all trains on the routes in question, not just HS2 trains. So the costs should be shared, and that doesn’t leave very much to be charged to HS2.

“Additional costs of Euston station – £2 bn”
To be funded by property development.

As for the rest, how am I meant to know any more than Bodman or Mitchell? None of this is their speciality any more than mine. But if their research is as valid as the big items above, it doesn’t bode well – for them.
So much for Hs2aa trying to pretend they have integrity. It’s one of their Directors who’s put his name to this rubbish remember…

Who can forget the lie from Hs2aa Director of Local Campaigns Peter Chegwyn about Coventry having a worse service than in steam days (nailed here)?

Or their lie about £8.3bn of ‘service cuts’ (nailed here)?

Their ‘sword of truth’ is just as bent as the last person who claimed the right to wield it – Jonathan Aitkin…

The GNGE: Joint line renaissance

23 Monday Mar 2015

Posted by Paul Bigland in GNGE, Rail Investment, Rail Moderinsation, Railways

≈ 1 Comment

Tags

GNGE, Investment, Modernisation, Railways, Transport

March has been a busy month for the railways. We’ve had new franchises launched, the arrival of the first of the next generation of Intercity trains & the start of new electric train services in the North West. There was another major milestone, but that’s not attracted the same level of attention. I’m talking about the completion of the £280 million rebuilding of the 86-mile GNGE ‘joint’ line which runs from Werrington (just north of Peterborough) through Spalding, Sleaford, Lincoln and Gainsborough, reconnecting with the East Coast Main Line at Doncaster.

History
The Great Northern Railway and its rival the Great Eastern Railway established the Great Northern and Great Eastern Joint Railway in 1879, with the final section linking Spalding & Lincoln opening in 1882. The main purpose of the route was to allow Yorkshire coal to be brought to East Anglia, although the line was also used by a rather sparse passenger service which remains little changed to this day. Throughout the BR years the line went into steady decline, losing much of its importance (and freight) when the section from Spalding to March closed in November 1982. At one time, much seasonal traffic was generated by the Spalding bulb festival with excursion trains arriving in the town from all around the UK. Now, even the sidings these trains were stabled in have disappeared.

The lines fortunes changed after privatisation when the railways stopped contracting and began expanding once more. Network Rail undertook a review of lines & decided to upgrade the GNGE as part of its East Coast Main Line Capacity Relief Project, providing an alternative route for both passenger & freight services.

The GNGE Alliance & work programme
To carry out the upgrade Network Rail formed an alliance of partners which comprises Network Rail, Babcock, Carillion and Siemens. Other companies such as May Gurney worked in sub-contracting roles, supplying their expertise to the Alliance

The intention was to increase line capacity, raise speeds from 60 to 75 mph and increase the loading gauge to W10 in order to allow the line to be used as a diversionary route by the growing number of intermodal trains traversing the network. Previously, these trains had been barred from the line. In the end, the Alliance managed to raise the loading gauge further to W12 at no extra cost.

To achieve this needed the following work:

Level crossings: This saw the largest ever level crossing replacement programme of its type on the national rail network, with all of the GNGE route’s 147 level crossings individually risk assessed to determine specific requirements, leading to the renewal/enhancement of 61 level crossings along the line of route & the closure of 3 more. Crossings have been converted to manually controlled barriers with object detection (MCB-OD) operation or MCB- CCTV controlled operation. The work allowed some permanent line speed restrictions to be lifted.

Track: 83,000 yards of plain line renewals, which entailed replacing wooden sleepers & jointed track with concrete sleepers & continuous welded rail. 70,000 yards of rerailing. Replacing dozens of switches & crossings (for example, the junction at Sleaford North). The re-instatment of double track on the Sleaford avoiding line by renewing & reconnecting the previously abandoned Down line. One of the many upsides to this work is that its reduced noise and vibration levels suffered by residents living close to the line as well as extending maintenance periods to 15 years.

Signalling: Closing 13 manual signalboxes & renewing the associated colour light & semaphore signalling. Replacing them with modular LED signals controlled from the signalling centre at Lincoln (although the line will eventually be controlled from the ROC at York).

Bridges & Tunnels: 49 underbridges, 19 overbridges and 82 culverts were either renewed or refurbished whilst track was lowered for 66 metres inside the sole tunnel on the line at Washingborough. One of the biggest jobs was at Sleaford, when 3 bridges (rail over road, rail over rail & rail over river) were replaced in one 10 day blockade.

Other work included 150,000 yards of vegetation clearance to improve lineside access and prevent autumnal leaf fall problems. 83,000 yards of fencing and 66,000 yards of concrete cable troughing were replaced.

The project was due to run from 2012 until late 2014 but due to the fact the line was an important diversionary route the timetable was extended into 2015. The landslip at Hatfield Colliery in 2014 had quite an impact on the programme as the diversion of traffic due to that event increased traffic levels on the joint line & forced some of the GNGE works to be rescheduled. A ‘wires down’ incident at Retford didn’t help as this also caused work to be postponed. Even so, a project that was originally planned as a four year scheme was undertaken in around half the time.

With a project of this size & nature it was vital to engage with the people & communities who lived along the route as some would suffer significant inconvenience. On one occasion this involved the Alliance laying on a minibus service to get people to & from their homes which had been isolated by a temporary level crossing closure. Another time a fire engine was hired & stationed near a row of houses cut off from the main roads – just in case! At another site the Alliance worked with villagers to cut trespass caused by people taking a shortcut across the line. A new pedestrian subway was cut through the embankment to allow safe crossing. This work wasn’t in the project scope but after consultations with residents it was decided to include it. At Heighington the Alliance donated £1,000 to help fund the restoration work at the Community centre.

All these legacies include significant environmental and community schemes which have enhanced the railway’s reputation as a good neighbour, as well as being beneficial in their own right. These and other initiatives led to the GNGE project achieving an ‘Excellent’ score of 78% in Civil Engineering Environmental Quality Assurance (CEEQUAL).

Huge effort was invested in engaging with schools to advise children of the even greater risks posed by trespass with the arrival of faster, quieter and more frequent trains. The Alliance’s Schools Liaison Officer made a total of 69 school visits and addressed over 15,000 children in all. These efforts were supported by a media campaign in newspapers, local radio and online.

The successful outcome of all this work means that, in future, not only could journey times be cut but operating hours can be extended. This means it could be possible to introduce something local Council’s have wanted for some time – the introduction of a Sunday service. Previously these would have been too expensive to achieve due to the staff costs of keeping 13 signalboxes open on extra shifts.

I was fortunate enough to be involved in the scheme as a project photographer working on projects big & small up & down the line. My intention is to include a series of pictures illustrating some of the work that was carried out on this important project which, to my mind, hasn’t received quite the attention that it perhaps should have. So, watch this space. Here’s a few to start with;

On the 11th September Transport Secretary baroness Kramer visited the line to see the work being done and officially open two important schemes. One was a new pedestrian subway, the other was the re-instatement of the Sleaford avoiding lines. Here's the Baroness flagging off a DB Schenker loco fitted with a commemorative headboad.

On the 9th September Transport Secretary baroness Kramer visited the line to see the work being done and officially open two important schemes. One was a new pedestrian subway, the other was the re-instatement of the Sleaford avoiding lines. Here’s the Baroness flagging off a DB Schenker loco fitted with a commemorative headboad.

On the 9th March Transport Secretary Claire Perry MP had a busy day visiting the GNGE to see the completed works & talk to local stakeholders & the project team. One of her tasks was to unveil this plaque on the new  footbridge at Ruskington. This has replaced a barrow crossing, making the station both safer and accessible to all.

On the 9th March Transport Secretary Claire Perry MP had a busy day visiting the GNGE to see the completed works & talk to local stakeholders & the project team. One of her tasks was to unveil this plaque on the new footbridge at Ruskington. This has replaced a barrow crossing, making the station both safer and accessible to all.

After unveiling the plaque at Ruskington, Claire Perry MP travelled the line back to Peterborough in an inspection saloon. She was accompanied by Network Rail's LNE route director, Phil Verster & GNGE Alliance staff who pointed out the work that had been undertaken.  In this picture we're passing Sleaford North Jn. The old signalbox still stands but it no longer controls the relaid junction & reconnected avoiding line.

After unveiling the plaque at Ruskington, Claire Perry MP travelled the line back to Peterborough in an inspection saloon. She was accompanied by Network Rail’s LNE route director, Phil Verster & GNGE Alliance staff who pointed out the work that had been undertaken. In this picture we’re passing Sleaford North Jn. The old signalbox still stands but it no longer controls the relaid junction & reconnected avoiding line.

Over the weekend of the 2nd- 3rd February 2013 the junction at Sleaford North was renewed. The new switches were brought to the site per-assembled using Network Rail's new tilt wagons. Here, a pair of Kirow cranes maneuver one of the switches into place.

Over the weekend of the 2nd- 3rd February 2013 the junction at Sleaford North was renewed. The new switches were brought to the site per-assembled using Network Rail’s new tilt wagons. Here, a pair of Kirow cranes maneuver one of the switches into place.

One of the problems with railway engineering is that the public don’t always get to see (and thus appreciate) where the money is spent on modernising & repairing our railways. Here’s a case in point...  In 2013 a series of culverts under the embankment near Stow Park were religned.  These hadn’t been touched since the line was built in 1882.  In some of them several courses of bricks has collapsed & needed to be replaced to prevent the danger of the embankment collapsing.  In this health & safety conscious age there’s no question of sending men into such a confined space, so a more modern method was used to reline the culvert.  Once debris had been removed a flexible liner was pulled through. Once in place, it was sealed at either end then inflated by compressed air in order that it pressed against the brickwork.  Once this was done, a trolley equipped with UV lamps was run through the liner, baking it. The liner material then sets like concrete.  It’s not a cheap fix.  Depending on the size of the liner they can cost tens of thousands of pounds, but they’re guaranteed for over 60 years.  Here’s one of the culverts after the work had been completed.

One of the problems with railway engineering is that the public don’t always get to see (and thus appreciate) where the money is spent on modernising & repairing our railways. Here’s a case in point…
In 2013 a series of culverts under the embankment near Stow Park were religned. These hadn’t been touched since the line was built in 1882. In some of them several courses of bricks has collapsed & needed to be replaced to prevent the danger of the embankment collapsing. In this health & safety conscious age there’s no question of sending men into such a confined space, so a more modern method was used to reline the culvert. Once debris had been removed a flexible liner was pulled through. Once in place, it was sealed at either end then inflated by compressed air in order that it pressed against the brickwork. Once this was done, a trolley equipped with UV lamps was run through the liner, baking it. The liner material then sets like concrete. It’s not a cheap fix. Depending on the size of the liner they can cost tens of thousands of pounds, but they’re guaranteed for over 60 years. Here’s one of the culverts after the work had been completed.

The culvert lining process was controlled from this van. Here, the operator can control & monitor the whole process, ensuring that the liner is baked at the right level  & that the UV trolley has passed all the way through the culvert. The system also provides a print-out of all the relevant data to show that the work has been done correctly.

The culvert lining process was controlled from this van. Here, the operator can control & monitor the whole process, ensuring that the liner is baked at the right level & that the UV trolley has passed all the way through the culvert. The system also provides a print-out of all the relevant data to show that the work has been done correctly.

In March 2013 three different bridges on the Sleaford avoiding line were replaced during a 10 day blockade.  Here, a 1000 tonne crane rests after lifting out the old rail bridge over the railway line to Skegness.  In the foreground to the left of the old bridge you can see the two sections of the new bridge ready to go in.

In March 2013 three different bridges on the Sleaford avoiding line were replaced during a 10 day blockade. Here, a 1000 tonne crane rests after lifting out the old rail bridge over the railway line to Skegness. In the foreground to the left of the old bridge you can see the two sections of the new bridge ready to go in.

In the early hours of the 3rd March 2013, the old 90 tonne railway bridge that spanned  the Skegness line is lifted out in one piece.

In the early hours of the 3rd March 2013, the old 90 tonne railway bridge that spanned the Skegness line is lifted out in one piece.

Once the old bridge had been removed & the site cleared & prepared the new bridge was lifted into place. This has been built in two sections (one for the Up line & another for the down line)

Once the old bridge had been removed & the site cleared & prepared the new bridge was lifted into place. This has been built in two sections (one for the Up line & another for the down line)

Crazy anti Hs2 campaigns of the week. No 1

22 Sunday Mar 2015

Posted by Paul Bigland in Hs2, Railways, Transport

≈ 2 Comments

Tags

Hs2, Politics, Railways

Every so often the anti Hs2 campaigners get outraged over something so superbly bonkers it’s worth highlighting to give people a laugh, so I’ve decided to start what I suspect will be a regular feature as their campaign has plenty of people who are either perma-outraged or simply as mad as a box of frogs…

Today the Sunday times has featured ideas on what the interiors of the new Hs2 trains may look like.
http://www.thesundaytimes.co.uk/sto/news/uk_news/National/article1534612.ece

None of this is actually new, but the Times mentions that the trains will have a range of classes, some of which will be fitted with leather seats.

This has caused absolute squeals of outrage from certain quarters, notably one Mop Denson, a Chilterns based anti campaigner. Mop is a regular, having frequently Tweeted that people should vote UKIP to ’save’ the Chilterns. The fact that UKIP don’t believe in man-made global warming & support fracking (so would do more damage to the Chilterns than good ) seems not to have occurred to her!

Mop has been busy tweeting that ;

Mopsnip 2

I can only assume that Mop never travels on her local First Great Western services, which have err, leather seats in First Class (and have had since 2007!), or for that matter Grand Central or Hull trains, which also have the same. Here’s FGW’s;

DG09017. FGW HST refurb. Bombardier. Derby. 20.12.06.
I presume that Mop will now be starting a campaign to remove such extravagances from our existing fleet & have them replaced with less hard wearing & more difficult to clean cloth ones?

I think we already know her answer;

DG166268. Anti Hs2 demo. London. 25.11.13.

The woeful truth behind the anti Hs2 campaign’s claims of expansion & ‘mass support’

21 Saturday Mar 2015

Posted by Paul Bigland in Hs2, Politics, StopHs2, Transport

≈ Leave a comment

Tags

Hs2, Hs2aa, Politics, Railways, StopHs2, Transport

It’s a month on from my blog exposing how little real support the anti Hs2 campaign has so I thought it was time for an update. After all, we’re in the run up to a general election & Hs2 has been in the news. The 3 major parties have all restated their support whilst UKIP & the Greens have restated their opposition. Has this galvanised the anti Hs2 campaign? The immortal words of the TV character Jim Royle spring to mind.

Previously, I’d highlighted the fact that all their claims of ‘mass support’ & being a ‘growing campaign’ were nothing but hot air & I used their support on social media to illustrate this. Of course, since then the Jeremy Clarkson incident broke. That really went viral, both on social media & in the real world. Over 1 million folks signed a petition to get the presenter reinstated!

http://www.standard.co.uk/news/celebritynews/jeremy-clarkson-petition-soars-past-one-million-signatures-as-suspended-top-gear-host-warns-protest-never-works-10124676.html

This seems to have thrown anti Hs2 campaigners into a bit of a depression. After all, they’ve been trying to drum up support for years & got nowhere. Then along comes Clarkson & within days – bang – 1 million signatures! Ironically, 1 million is the number some anti Hs2 folks claim are blighted by the project…

Let’s revisit the original 22nd February ‘scores on the doors’ for the Hs2 anti’s on social media. Today’s updated scores are in brackets along with percentage changes.

Here’s the Twitter followers of the main anti Hs2 groups:

Hs2 Action Alliance (@hs2aa): 3,199 followers (today 3,237 + 38 = 1.19%)

StopHs2 (@stophs2): 4,112 (today 4,167 + 55 = 1.34%)

I’ve also included both of StopHs2’s leaders.

Joe Rukin (@joerukin): 1,857 (today 1,871 + 14 = 0.75%)

Penny Gaines (@penny_gaines): 399 (today 401+ 2 = 0.5%)

51M (@51M_Hs2project): 610 (today 613 + 3 = 0.49%)

Here’s AGAHST’s ‘leader’

AGAHST’s Deanne DuKhan (@DuKhanD): 654 (today 654 + 0 = 0%)

Meanwhile, over on Facebook (used by over 30 million Britons);

Hs2aa: 2,168 (today 2,154 – 14 = minus 0.65%)
https://www.facebook.com/HS2AA?fref=ts

StopHs2: 6,415 (today 6,325 – 90 = minus 1.4%)
https://www.facebook.com/STOP.HS2?fref=ts

51M: 393 (today 387 – 6 = minus 1.53%)
https://www.facebook.com/pages/51m_HS2project/218611348167462

It’s worth noting that 51M’s FB account still hasn’t been updated since the 1st June 2011.

Hmm, so much for that expanding campaign! Expanding? It’s actually shrinking on the media with the biggest penetration (Facebook) and hardly moving at all on Twitter (a medium widely regarded as stagnant). Not only are they failing to get their message across, they’re actually in retreat. Perhaps they should sack Joe Rukin & give his job to Jeremy Clarkson?

Of course, in real life – things are even worse. Hs2aa has blown all its money on futile legal cases so isn’t even churning out misleading posters. StopHs2 isn’t in any better position. No-one has organised any demonstrations at Parliament because (frankly) the numbers showing up is plain embarrassing – I’ve seen more life in a tramps vest! What is also telling is that their annual gathering in Staffordshire has bitten the dust too. It failed to happen in 2014 & there’s no sign of it happening in 2015 either. Talk about failing to get your message across…

So,next time you hear a few lazy journalists trot out the usual trite phrases about how there’s ‘strong’ opposition to Hs2, feel free to ask them, “where”?

Thoughts on today’s ‘Northern Powerhouse’ announcements.

20 Friday Mar 2015

Posted by Paul Bigland in Politics, Railways, Transport

≈ Leave a comment

Tags

Investment, Northern Powerhouse, Railways, Transport

Here’s a link to today’s Northern Transport Strategy report

Click to access the-northern-powerhouse-tagged.pdf

My first thoughts?

It’s good to see that the report has added flesh to the bones of Hs3 by coming up with a variety of costed schemes. This shopping list of options should really help to move the debate forward. As for the total bill, it’s worth bearing in mind that all these schemes are loaded with a 60% ‘optimisation bias’ this should decrease once the schemes are worked out in detail.

Of course, lots of questions remain. For example, what route would a new line through the Pennines take? There are also implications for current plans to electrify the Leeds – Manchester Trans-Pennine route through the Colne valley via Huddersfield. Is the scheme likely to be delayed further by the announcement?

Real positives are the way investment focus has shifted away from concentrating on London & the South East & the fact we (at last) seem to be looking at a strategy that involves looking beyond Parliamentary terms or even Network Rail control periods. No doubt the cynics will see these announcements as window dressing for the forthcoming election. I don’t subscribe to that view. There’s been too much work put in by too many folks on all sides of the political divide. Although I do have concerns about the way some Northern politicians all too easily lapse into parochialism – especially on the Eastern side of the Pennines!

Other interesting parts of the announcement are the proposal to simply the fares structure & introduce what sounds like a Northern equivalent to London’s travel zones. Modernising ticketing with a contactless card system should also be welcomed.

Freight often seems to be an afterthought in these grand plans so it’s a welcome change to see a freight strategy mentioned.

Back on another favourite subject (Hs2) I believe this report & the people united behind it demonstrate just how irrelevant those campaigning against Hs2 are nowadays. Rather than it being stopped we’re seeing proposals to bring it to Crewe 6 years earlier than originally planned!

I’ll blog more when I’ve had chance to read through the full report. For now, here are the rail options included in the announcement, along with a map;

Screen-Shot-2015-03-20-at-06.39.19-600x381

• Leeds to Newcastle times of around 50 minutes (compared to a best time of 87 minutes currently): £8.5bn – £14bn – Option 1

• Sheffield to Manchester times of around 27 minutes (compared to a best time of 48 minutes currently), and Manchester to Leeds in around 30 minutes: £12bn – £19bn – Option 2

• Manchester to Leeds times of around 30 minutes (compared to a best time of 49 minutes currently): £6.5bn – £10bn – Option 3

• Liverpool to Manchester times of around 20 minutes (compared to a best time of 32 minutes currently): £8bn – £13bn – Option 4

• Leeds to Hull times of around 28 minutes (compared to a best time of 55 minutes currently): £5.5bn – £9bn – Option 5

Upgrades and cut-offs costing £12.5bn-£23bn-plus

• Leeds to Newcastle journey times of around 70 to 80 minutes: £1bn-£4bn – Option 6

• Sheffield to Manchester times of around 39 minutes: £3bn – £5bn – Option 7

• Manchester to Leeds times of around 34 minutes: £4.5bn – £7bn – Option 8

• Liverpool to Manchester times of around 23 minutes: £4bn and £7bn – Option 9

• Sheffield to Hull times of around 60 minutes (compared to a best time of 86 minutes currently) through upgrading the existing route – Option 10 – or using HS2 into Leeds, combined with the proposed Leeds to Hull improvements

More Rukin revelations (the great Royal Mail fiddle)

18 Wednesday Mar 2015

Posted by Paul Bigland in Hs2, Railways, StopHs2, Transport

≈ 2 Comments

Tags

Anti Hs2 mob, Hs2, Joe Rukin, Politics, Railways

The published minutes of the High Speed Bill Ctte for the 12th March contain an interesting revelation from Stop Hs2’s Joe Rukin on his stunt to stand for MP in the 2010 election. It was all a cynical scam to avoid paying the Royal Mail! Here’s the extract from the minutes:

74. CHAIR: Are you a candidate on this occasion or not?

75. MR RUKIN: No. That was just a publicity stunt to get leaflets to everyone in the constituency for 800 quid.

Click to access 120315_Uncorrected_Morning.pdf

The ‘800 quid’ Rukin refers to is the deposit a candidate must pay to stand in an election (it’s actually £500 but then Rukin’s never been good with facts).

The constituency of Kenilworth & Southam contained 64,362 voters in 2010. At the time, a 2nd class stamp was 32p, so it should have cost StopHs2 £20,595 to distribute his anti-HS2 leaflets. By getting the taxpayer to subsidise the mailshot by disguising it as an electoral leaflet, stopHs2 saved a fortune

Perhaps someone with either knowledge of the postal and/or electoral system might like to answer this unanswered question. Do Royal Mail get reimbursed to deliver election letters out of taxpayers money via the Electoral Commission or similar? If so. Rukin has surely fiddled the taxpayer?

The irony is of course, it saved stopHs2 money but it didn’t save their campaign. That was holed below the waterline when a massive majority of 452 MPs voted to pass the Hs2 Hybrid Bill & it’s been slowly sinking ever since…

UPDATE:

The Cabinet Office have confirmed that the Taxpayers DOES pay for the delivery of the minimum of one leaflet for each candidate in a General Election. This means there’s little doubt that Rukin’s cynical election tactic has duped taxpayers of thousands of pounds.

Election special: Farage’s fag packet calculations are more porkies.

15 Sunday Mar 2015

Posted by Paul Bigland in Hs2, Railways, Transport, UKIP

≈ 3 Comments

Tags

Cornwall, Farage, Hs2, Politics, Railways, UKIP

This month all the major political parties reiterated their support for building Hs2, much to the frustration of the anti Hs2 campaign who’ve clearly had their bluff called. The antis may be busy on social media pretending otherwise but in the real world it’s clear their campaign’s unraveling rapidly. None of the major political parties see them as a credible political force they’re going to lose any sleep over. Only UKIP & the Greens oppose Hs2 & this week UKIP unveiled their Hs2 campaign poster. I have to say, it’s stunning in its blandness. ‘UKIP will stop Hs2 before it runs out of control’ it whimpers.

Nigel Farage travelled to the Chilterns to launch the poster along with UKIPs local Candidate, Chris ‘imaginary friends’ Adams (of Twitter fame, see previous blog). Here’s a report from the Western Morning News;

http://www.westernmorningnews.co.uk/UKIP-scrap-HS2-says-Farage-8211-highlighting-poor/story-26168763-detail/story.html

Note Farage’s claim that “Penzance is five hours 11 minutes from Paddington. It was quicker to get to Penzance before the First World War”.

Really Nigel? Let’s examine that claim shall we?

Today’s fastest service between the two is the 10.06 Paddington – Penzance which takes 5hrs 5mins (not 5hr 11mins as Farage claimed, no train service takes that time). It stops at Reading, Exeter, Newton Abbot & Plymouth before it enters Cornwall.

Sim Harris, the Managing Editor of Railnews (and a Cornishman himself) tells me this: “The best London-Penzance times in 1902 and 1947 were c.9h30 and 7h00 respectively. In summer 1960 (still with steam) the 10.30 ex Padd managed 6h05 (but this was non-stop as far as Plymouth, where an engine change was required). In 1971 the best time was 5h35, but that was again the 10.30. (*others were still taking 6h00+).

Only the BR Intercity 125s made the present timings possible”.

So, Farage is caught out telling porkies yet again. There’s a surprise!

UPDATE at 18:44.

A few hour after I’d written this, Virgin Trains East Coast MD @DavidHorne had done some research through copies of the old Bradshaw timetables & tweeted this;

“Bradshaws 1922 timetable has the Limited dep Paddington 1030, arrive Penzance 1700. Stops at PLY, TRU, Gwinear Rd & St Erth.”

That’s 6hrs 30mins – far short of the current 5hr 05mins. David’s second tweet revealed some genuine pre WW1 timings:

“From Oct 1906 after Westbury route opened, best Pad-Pz journey time was 6h35, cut to 6h30 in 1914 (on the 1030). Now it’s 5h05”

So, there we have it – Farage’s factoid farrago. Once again UKIP haved proved that – as far as they’re concerned, facts are what you make up.

For those who enjoy such things, here are the 1902 & 1922 timetables;

1902 GWR TT A

1922 Bradshaw

People care more about Jeremy Clarkeson than they do about opposing Hs2

11 Wednesday Mar 2015

Posted by Paul Bigland in Hs2, Railways

≈ Leave a comment

Tags

Hs2, Railways, StopHs2

Today’s the 5th anniversary of the launch of Hs2 & also a delicious irony that shows how the only folk who really worry about Hs2 are the people who live on the route.

For years anti Hs2 campaigners have launched petition after petition, trying to drum up opposition to the project & show how many people support them.

They’ve been a disaster. Here’s their best effort;

http://www.bbc.co.uk/news/uk-england-15256229

All they’ve shown is the opposite. Each time they launch a new one, the numbers fall off. Some of the petitions have been given months to run & still got bugger all signatures. Yet anti’s assure us that the ‘majority’ oppose Hs2.

Then, today,the news breaks about Jeremy Clarkson’s ‘fracas’ & suspension by the BBC. Within the space of a few hours, 350,000 sign a petition to have him reinstated.

http://www.bbc.co.uk/news/entertainment-arts-31832698

It puts the anti Hs2 mobs claims of mass public support into perspective, doesn’t it?

 

Why the anti Hs2 campaign won’t be celebrating Hs2’s 5th birthday..

11 Wednesday Mar 2015

Posted by Paul Bigland in Green Party, Hs2, Michael Dugher MP, Politics, Railways, Transport, UKIP

≈ 6 Comments

Tags

Hs2, Joe Rukin, Railways, StopHs2, Transport. Michael Dugher MP, UKIP

Ironically, today the campaign against Hs2 is ‘celebrating’ the 5th anniversary of the announcement of the project.  You would have thought they’d have known better as all they’re doing is drawing attention to their five years of failure in trying to stop it!

With nothing new to say & having no cunning plans now all their previous ones have ended in disappointment & failure StopHs2 are trying to bring back their ‘No votes for you with Hs2’ campaign from the dead.  Bad move. The rotting corpse is too far gone to resuscitate, not least because the anti Hs2 campaign has too few supporters who command too few votes.  I’ve looked at this in two previous blogs;

https://paulbigland.wordpress.com/2015/01/17/the-anti-hs2-campaign-dying-by-degrees-pt1/

&

https://paulbigland.wordpress.com/2015/02/22/the-anti-hs2-campaigns-numbers-dont-add-up-again-social-media-edition/

In the intervening time, things have got worse for their campaign.  The Hs2 Hybrid Bill Committee continue to plough through petitions & remain on course for the Bill to gain Royal Assent by December 2016.

On the political front, all three major parties remain committed to the Hs2 project. The anti Hs2 campaign constantly predicted party political U-turns.  None have ever materialised as no-one is actually frightened by their campaign.  There might be a couple of nervous Tory MPs on the Chilterns Hs2 route but even there the challenge from UKIP seems to be receding after UKIP’s hopeful Chris Adams was exposed in the national media for packing his Twitter feed with fake followers;

https://paulbigland.wordpress.com/2015/02/08/ukip-the-anti-hs2-mob-are-at-it-again/

You can see why UKIP & the anti’s get on, can’t you? Both groups largely rely on imaginary friends!

Meanwhile, Labour’s Shadow Transport Minister gave an interview to February’s ASLEF Journal, where he said: “We are absolutely committed to HS2”

Click to access 1502aslefjournal.pdf

Absolutely no sign of a U-turn there then…

The national opinion polls offer nothing positive either.  The real political race is between parties who all support Hs2, whilst the two that oppose UKIP & The Greens have both had a torrid time.  There’s an almost weekly drip of stories about racism within UKIP (where trying to stop them popping up is like playing a game of ‘whack a mole’) & the Greens have had their Leader, Natalie Bennett, implode in a radio interview that’s gone viral.  The Greens rail policy doesn’t exactly stand up to scrutiny either.  I’ve dissected it here;

https://paulbigland.wordpress.com/2015/03/08/the-greens-rail-policy-is-a-dogmatic-mess/

UK polling reports predict that, between them (at best) the Greens & UKIP will have less than half a dozen MPS. That’s meant to Stophs2?  Oh, please…

Meanwhile, things continue to get worse at home.  At the Hs2 Committee hearing on the 10th March, Denham Against Hs2 Chairman Frank Partridge let the cat out of the bag about the number of Hs2 ‘Action’ groups.  The likes of Hs2aa are still pretending there are over 90.  Frank admitted to the Committee that the real number is ’40 to 50′ – around half the numbers claimed!  More proof (if it were needed) that the campaign’s been exaggerating the size of its activist base.

All this leaves the anti Hs2 campaign with bugger all to celebrate on Hs2’s 5th birthday.  If I was Joe Rukin, I’d be too busy looking through the ‘situations vacant’ columns to be boasting about how a lot of imaginary voters are going to Stop Hs2….

← Older posts
Newer posts →

Recent Posts

  • 4th September picture of the day…
  • 1st September picture(s) of the day…
  • Bits and bobs from Southport…
  • A visit to the HS2 Duddeston viaduct.
  • 20th August picture of the day…

Recent Comments

Charles Esteppé's avatarCharles Esteppé on Southport: The 12th July…
Ian Dinmore's avatarIan Dinmore on 5th July picture of the d…
Andy Davies's avatarAndy Davies on Rolling blog. Capital times. D…
Andy's avatarAndy on Rolling blog. Three peaks by r…
Rob Shepherd's avatarRob Shepherd on Political plus ça change…

Archives

  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • June 2013

Categories

  • 'Green' madness
  • 'Think Tanks'
  • 144e
  • 2005 London bombing
  • 2017 General election
  • 3 peaks by rail
  • 3 Peaks by ral
  • 51M
  • 7/7
  • Abandoned railways
  • Abu Dhabi
  • ACoRP
  • Adam Smith Institute
  • Adrian Quine
  • Advertising
  • Air Travel
  • Aircraft
  • Airports
  • Airshows
  • Allan Cook
  • Alstom
  • Amsterdam
  • Andrea Leadsom MP
  • Andrew Gilligan
  • Andrew Haylen
  • Andy Burnham MP
  • Anti Hs2 mob
  • AONBs
  • Arambol
  • Architecture
  • Art
  • Australia
  • Avanti West Coast
  • Bali
  • Bangkok
  • Bank holidays
  • Barrow Hill
  • beer
  • Belgium
  • Bereavement
  • Berlin
  • Bigotry
  • Birmingham
  • Blackpool
  • Blists Hill
  • Blue passports
  • Boris Johnson MP
  • Bradford
  • Brazil
  • Brexit
  • Brighouse
  • Brighton
  • British Railways
  • British Railways (BR)
  • Buckinghamshire
  • Buses
  • Byline media
  • Calder Valley
  • Calderdale
  • Cambridge
  • Cambridgeshire
  • Canals
  • Cardiff
  • Carillion
  • Carolyne Culver
  • Censorship
  • Charities
  • Cheryl Gillan MP
  • Cheshire
  • Chester
  • China
  • Chris Packham
  • Claire Perry MP
  • Class 08
  • Class 155
  • Class 180
  • Class 313
  • Class 314s
  • Class 317
  • Class 319
  • Class 320
  • Class 321
  • Class 323
  • Class 345
  • Class 365
  • Class 455
  • Class 456
  • Class 507
  • Class 508
  • Class 60s
  • Class 91
  • Climate Change
  • Communications
  • Community
  • Community rail
  • Community Rail Network
  • COP26
  • Corbynwatch
  • Coronavirus
  • Coventry
  • Covid 19
  • CP5
  • Crap journalism
  • Crazy anti Hs2 campaigner of the week
  • Crazy kippers
  • Crewe Hub
  • Crossrail
  • Cuba
  • Cumbria
  • Customs
  • Cyberattacks
  • Cycle India
  • Cycling
  • Dame Bernadette Kelly
  • Dawn
  • Democracy
  • Denmark
  • Derbyshire
  • Desiro City
  • Devon
  • Dewsbury
  • Diary
  • Dispatches
  • Doha
  • Donald Trump
  • Doomed
  • Dorset
  • Down memory lane
  • Duxford
  • East Lancashire Railway
  • East Midlands Railway franchise
  • East Midlands Trains
  • East-West rail
  • Easter fairy stories
  • ECML
  • Economic illiteracy
  • Economics
  • election2015
  • Elon Musk
  • Engineering
  • Environment
  • Essex
  • Eurostar
  • Euston
  • Extinction Rebellion
  • Fake News
  • Festivals
  • Film and TV
  • Flag shaggers
  • Flooding
  • Flora and Fauna
  • Food
  • Food and drink
  • Foot in mouth
  • Gardening
  • GBRf
  • GCRE
  • General election
  • General election 2019
  • General election 2024
  • Georgetown
  • Germany
  • Glasgow
  • Glossop
  • GNGE
  • GNRP
  • Goa
  • Goole
  • Grand Central trains
  • Grant Shapps MP
  • Great Western Railway
  • Greater Anglia franchise
  • Greater Manchester
  • Greece
  • Green issues
  • Green madness
  • Green Party
  • Grok
  • Gt Missenden
  • GTR
  • Guido Fawkes
  • GWML
  • GWR franchise
  • Gwyll Jones
  • Halifax
  • Hampshire
  • Harvil Rd Hs2 protest
  • Harz railway
  • Heathrow 3rd runway
  • High Speed 1
  • High Speed UK
  • History
  • Hitachi
  • Hong Kong
  • House of Lords
  • HS North
  • Hs1
  • Hs2
  • Hs2 Bow Group
  • Hs2 petitions
  • Hs2 Phase 2B
  • Hs2 to Crewe
  • Hs2aa
  • HS2Rebellion
  • HSUK
  • Huddersfield
  • Humberside
  • Humour
  • Hurricane Ophelia
  • Huw Merriman MP
  • Hypocrisy
  • I love my job
  • Imperial College London
  • Imperial War Museum
  • India
  • Indonesia
  • Infrarail
  • Innotrans
  • Internet
  • Iolo Williams
  • iran
  • Ireland
  • Islamophobia
  • Istanbul
  • Jacob Rees Mogg
  • jakarta
  • Jeremy Corbyn
  • Jeremy Corbyn MP
  • Jo Johnson MP
  • Joanne Crompton
  • Joe Rukin
  • John McDonnell MP
  • John Poyntz
  • Johnathan Bartley
  • Journalism
  • Kanchanaburi
  • Kemi Badenoch
  • Kent
  • Kuala Lumpur
  • Labour election
  • Lancashire
  • Laos
  • Law and order
  • Lazy journalism
  • Leicestershire
  • Levelling up
  • Liam Halligan
  • libel
  • Lilian Greenwood MP
  • Lincolnshire
  • Liverpool
  • LNER
  • Local elections
  • Local elections 2018
  • Lockdown
  • London
  • London Underground
  • Lord Berkeley
  • LRT
  • M62 motorway
  • Major Projects Authority
  • Malaysia
  • Manchester
  • Manchester Airport
  • Manchester Victoria
  • MAPA
  • Mark Keir
  • Marketing
  • Martin Tett
  • Mediawatch
  • Melton Mowbray
  • Memory Lane
  • Merseyrail
  • Merseyside
  • Michael Dugher MP
  • Michael Fabricant MP
  • Mid Cheshire against Hs2
  • Miscellany
  • Modern Railways
  • Monorails
  • Music
  • Musings
  • Mytholmroyd
  • Natalie Bennett
  • National Rail Awards
  • National Trust
  • Nepal
  • Network Rail
  • Never a dull life
  • New Economics Foundation
  • New trains
  • New Year
  • New York
  • New Zealand
  • Newcastle
  • NHS
  • Nigel Farage
  • Norfolk
  • Norland scarecrow festival
  • North Yorkshire
  • Northern Powerhouse
  • Northern Rail
  • Northumberland
  • Norway
  • Nostalgia
  • Nottingham
  • Obituaries
  • Old Oak Common
  • ORR
  • Ossett
  • Our cat, Jet
  • Oxfordshire
  • Pacers
  • Paris terror attack
  • Parliament
  • Pasenger Growth
  • Patrick McLouglin MP
  • Penny Gaines
  • Peter Jones
  • Peterborough
  • Photography
  • Photojournalism
  • Picture of the day
  • Poetry
  • Politics
  • Porterbrook
  • Portugal
  • PR nightmares
  • Preston
  • Protest
  • Public Accounts Ctte
  • Pubs
  • rail ale
  • Rail electrification
  • Rail fares
  • Rail Investment
  • Rail Live 2021
  • Rail Live 2022
  • Rail Live 2024
  • RAIL magazine
  • Rail Moderinsation
  • Rail PR
  • Railfreight
  • Railstaff awards
  • Railtex
  • Railway Benefit Fund (RBF)
  • Railway preservation
  • Railways
  • Rant
  • Religion
  • Reservoir blogs
  • RFEM
  • Richard Wellings
  • Ride India
  • Rishi Sunak
  • Road accidents
  • Rolling blogs
  • ROSCOs
  • Royal Mail
  • Royal Wedding 2018
  • RSPB
  • Rugby Observer
  • Rushbearing
  • SAIP
  • Sarah Green
  • Scores on the doors
  • Scotland
  • Scotrail
  • Sheffield
  • Ships
  • Shrewsbury
  • Shropshire
  • Siemens
  • Signalling
  • Silly season
  • Simon Heffer
  • Simon Jenkins
  • Singapore
  • Sleeper trains
  • Snail mail
  • Social media
  • South West Trains
  • Southport
  • Sowerby Bridge
  • Spectator magazine
  • Sri Lanka
  • St Pancras station
  • Stafford
  • Stamford
  • Station buffets
  • StopHs2
  • Surabaya
  • Surrey
  • Swansea
  • Talgo
  • Teresa May
  • Terrorism
  • Tesla
  • Thailand
  • Thameslink
  • The 'Beast from the East'
  • The BBC
  • The Big 6
  • The Cludders
  • The Daily Express
  • The Economy
  • The end of the line
  • The fog
  • The Grauniad
  • The Great Central railway
  • The Green Party
  • The Guardian
  • The Independent
  • The Labour Party
  • The Moorcock Inn
  • The Piece Hall
  • The PWI
  • The Railway Children
  • The Rodelblitz
  • The USA
  • The Woodland Trust
  • Tilford
  • Tony Allen
  • Torquay
  • Tourism
  • TPE
  • Traffic congestion
  • Trams
  • Trans-Pennine electrification
  • Trans-Pennine Route Upgrade
  • Transport
  • Transport Committee
  • Transport for Wales (TfW)
  • Travel
  • TRU
  • Turkey
  • Twilight years
  • Twitter
  • Twitter (and how not to use it)
  • UK
  • UK steel industry
  • UKIP
  • ukraine
  • Uncategorized
  • Uxbridge
  • Vandalism
  • Victoria Prentis MP
  • Virgin Trains
  • Virgin West Coast
  • Vivarail
  • Wales
  • Walking
  • Warwickshire
  • WCML
  • Weather
  • West Yorkshire
  • Wigan
  • Wildlife Trusts
  • Wiltshire
  • Worcester
  • Work
  • World car-free day
  • World War 1
  • World War Two
  • Yorkshire
  • YorkshireStopHs2

Meta

  • Create account
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.com

Blog at WordPress.com.

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Subscribe Subscribed
    • Paul Bigland
    • Join 469 other subscribers
    • Already have a WordPress.com account? Log in now.
    • Paul Bigland
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
Loading Comments...