• About

Paul Bigland

~ Blogging on transport, travel & whatever takes my fancy.

Paul Bigland

Category Archives: Simon Jenkins

Simon Jenkins, HS2 and the tunnel that never was…

15 Tuesday Nov 2022

Posted by Paul Bigland in Hs2, Politics, Railways, Simon Jenkins

≈ 7 Comments

Tags

Hs2, Politics, Railways, Simon Jenkins

It’s not often that I have the opportunity to fillet so much dishonest and fact-free nonsense about HS2 in the media nowadays, but I’ve been given the rare threat thanks to two people who’ve been writing trash about HS2 for years. Yesterday it was Andrew ‘transcription error’ Gilligan, one of the Tories client journalists who for many years was embedded in the heart of the Tory party as one of Boris Johnson’s coterie.

Today it’s the turn of the dyspeptic Simon Jenkins, whose penned his latest fact-free polemic in the Guardian, which you can find here. It’s up to his usual standard, loads of assertions with no facts to back it up and made-up numbers for the ‘true’ cost of HS2. I’ve examined Jenkins troubled relationship with facts before in this blog.

However, Jenkin’s goes one further than Gilligan and claims that ALL of HS2 should be cancelled immediately – even Phase 1 where construction is well advanced. To support his claim, Jenkins says this;

“A New Jersey governor, Chris Christie, famously halted a rail tunnel under the Hudson river by simply ordering the contractors to fill in the hole”.

There just one teeny problem with this claim. It’s complete and utter bollocks. Jenkins has made it up, and the reality shows Jenkins example of the ARC demonstrates that his idea is short-sighted and stupid in the extreme.

Here’s the reality. Chris Christie does exist. He was the Republican Governer of New Jersey between 2010 and 2018 when he lost to his Democrat challenger. He’d put his hat in the ring for his party’s Presidential nomination, he got nowhere, but Donald Trump did, Christie endorsed him and joined his team, and the rest, as they say, is history.

But what about this tunnel? That didn’t exist. There *were* plans to build one (there still are). Known as ‘Access to the Regions Core’ (ARC) the plan was to build two new tunnels from New Jersey to Manhattan and a new railway station next to Penn Station which was at capacity. The original cost of the project was estimated at $8.7bn. Preparations for building the tunnels began in 2009 with a completion date of 2018, but in 2010 Christie effectively cancelled the project by withdrawing his part of the funding, citing ‘concerns’ about cost overruns. By the time the project was cancelled in October 2010 all that was built was the Palisades ‘tunnel’, an underpass under Tonnelle Ave in North Bergen. Contracts *had* been let for tunnelling, Skanska had won the design and build contract for the full Palisades Tunnel on May 5, 2010, just 5 months earlier but tunnelling proper hadn’t even begun.

That wasn’t the end of the story. The decision was controversial and Christie became embroiled in a series of legal actions over where the money went – especially Federal funding towards the project. The federal government demanded repayment of funding received by New Jersey Transit for the project. After litigation, an agreement was reached where part of the funds were returned while other monies were used on transit-related projects.

That wasn’t the end of the story. Christie’s administration was later investigated and fined $400,00 for diverting funds from the project to subsidise various roads projects. Plus, some of New Jersey’s funds earmarked for ARC were eventually diverted to the state transportation trust, normally funded by a gasoline tax, one of the lowest in the United States. This was believed by many to be a cynical attempt to subsidise motoring by avoiding raising gas tax,

In March 2012, the Government Accountability Office (GAO), a federal agency, published a report entitled Commuter Rail Potential Impacts and Cost Estimates for the Cancelled Hudson River Tunnel Project, which concluded that Christie’s basis for cancellation was a misrepresentation and that he misstated the estimated costs, cost over-runs, and New Jersey’s obligation to pay them (see link)

So, was anything ‘filled in’ as Jenkins claims? No, because the project never really died because it was still needed. This need became ever more evident after 2012’s Hurricane Sandy caused damage to the existing 100 year old rail tunnels which led to flooding of the New York subway. It’s estimated $5bn damage was caused to the rail systems. Some of the completed design and engineering work has been used by Amtrak to develop the Gateway Programme, which will build yes – you’ve guessed it – new tunnels under the Hudson! The Gateway Project was unveiled on February 7, 2011, just 4 months after Christie cancelled ARC.

So, the project Jenkins cites isn’t dead at all. Nothing was filled in and the delays and political shenanigans have cost taxpayers dearly! The original ARC project was budgeted at $10 billion and was due to open in 2018-20. The Gateway programme’s 2022 projected cost of the tunnels and related projects is $16.1 billion.

What Jenkins completely fails to mention is cancelling a project where no main construction works and no Tunnel Boring Machines (TBMs) were running is a very different kettle of fish to HS2, where the Chiltern tunnels are already over 8 miles long, the Long Itchington Tunnel has one of the 1-mile-long tunnels completed and at West Rusilip there are two more TBMs already boring East into London. Oh, and that’s without the 3.5km long Colne Valley viaduct which is already well underway! Add in all the other civil engineering work along the phase 1 route and we’re talking of 10s of billions already spent or committed. To claim this can just be cancelled or ‘filled in’ is nothing more than idiocy. But then when did Jenkins ever deal in reality when it comes to HS2? The most amusing thing about Jenkins using the Hudson tunnels as an example of how you could scrap HS2 (apart from the fact it was bollocks) is it’s exactly the opposite. It’s a classic example of why you shouldn’t cancel these vital projects and how doing so comes back to bite you on the arse!

Unlike Jenkins US tunnel which was never started much less ‘filled in’. here’s one of the HS2 Chiltern tunnels under construction. This is now over 4 miles long, as is its next door neighbour. The Long Itchington tunnel is half-complete and the West Ruislip tunnels already have two TBMs running. That’s over 9 miles of tunnels bored already…

January 1st 2023 update.

I was sent this link yesterday which puts the nail in the coffin of Jenkins nonsense. The new rail tunnel under the Hudson is on its way…

“Hudson River Rail Tunnel Construction to Begin in 2023 With $292M Grant”

The project is now expected to cost $30 billion.

I’ve a small favour to ask…
If you enjoy reading this or any of the other blogs I’ve written, please click on an advert or two. You don’t have to buy anything you don’t want to of course – although if you did find something that tickled your fancy that would be fab! – but the revenue from them helps me to cover some of the cost of maintaining this site (which isn’t cheap and comes out of my own pocket). Remember, 99% of the pictures used in my blogs can be purchased as prints from my other website –  https://paulbigland.zenfolio.com/

Or – you can now buy me a coffee! https://ko-fi.com/paulbigland68312

Thank you!

Simon Jenkins latest anti HS2 tosh examined…

04 Wednesday Aug 2021

Posted by Paul Bigland in Hs2, Politics, Railways, Simon Jenkins

≈ 26 Comments

Tags

Hs2, Politics, Railways, Simon Jenkins

Every so often Guardian columnist Simon Jenkins bile duct overflows and he releases a torrent of vituperative and bombastic nonsense about the HS2 rail project. He’s been doing this on a regular basis for years now. The fact he’s always proved spectacularly wrong and fact-free never stops him as the man clearly believes his own myths and is unashamed by the fact his fictional tirades never age well.

Crewe based blogger Tim Fenton has punctured Jenkins hot air balloon several times in the past. Notably here in 2014 and here in 2015. Sadly, the fact nowadays he’s in the fairy story business rather than real Journalism hasn’t stopped the Guardian publishing him. I’m assuming their Editor no longer cares about trivial things like facts and the truth as clicks are more important. The rubbish Jenkins writes are good enough to generate those as his rants against HS2 are guaranteed to be shared by the projects opponents – even ones whom aren’t natural Guardian readers! It’s a win for the Grauniad and a loss for those who like decent, factual journalism, analysis – and the truth.

Let’s have a look at Jenkins latest fact-free farrago shall we? I’d suggest wearing a peg on your nose whilst doing it as the smell of bullshit is overpowering. It’s entitled “Depleted and unwanted, HS2 hurtles on as Johnson’s £100bn vanity project” – which is a good start as that’s three untruths in the headline and we haven’t even got to the article yet! The first paragraph is no better…

“Britain’s new high-speed railway will not – repeat: not – get to the north of England. It will go back and forth from London to the Midlands and its chief beneficiaries will be London commuters. All else is political spin”

Really? Jenkins seems unaware that contracts for building HS2 Phase 2a from Birmingham to Crewe have already been let. Contractors have already started on preparatory work as Phase 2a gained Royal Assent on the 11th February 2021 after flying through both Houses of Parliament with a huge majority – just as Phase 1 did. Now, what was that about “unwanted”? HS2 has always commanded huge-cross party political support. So much so that the handful of opponents in the Lords didn’t even bother calling for a vote on the Phase 2a bill as they knew they were completely outnumbered.

Oh, and “London Commuters”? Hs2 is a long-distance railway. Like all other long-distance railways that means the vast majority of passengers will be leisure travellers, NOT commuters. The HS2 business case is based on 70% of travellers doing so for leisure. How can that be predicted? Easy, because we know who uses the existing Long-Distance services.

Meanwhile, Jenkins continues to dig a hole…

“This became certain last week as the government’s internal major projects authority declared phase two of the HS2 project, to Manchester and Leeds, effectively dead. While the already-started London-to-Birmingham stretch is still marked at “amber/red” for “successful delivery in doubt”, anything north of Crewe has been designated “unachievable”.

This is complete cobblers of course and will come as real news to people on the leg from Crewe to Manchester (and HS2 Ltd themselves) as the Government announced the timetable for the Phase 2b leg in the Queens Speech at the state opening of Parliament. The bill will be deposited in Parliament next year.

As for this amber/red and ‘unachievable’ nonsense, this is Jenkins failing to understand what the ratings (given by the Infrastructure and Projects Authority) actually mean. For example, we have two ‘unachievable’ Queen Elizabeth class aircraft carriers floating around right now that the IPA rated red. Oh, and the new Intercity Express Programme (IEP) trains built by Hitachi that are ploughing up and down the East Coast and Great Western main lines? They were rated ‘unachievable’ as well.

What’s next? Oh yes,

“Since HS2 has always been politics-driven – no rail strategy ever gave it priority”

This is more complete bollocks. The origins of HS2 are in several studies looking at the needs for future rail capacity that were carried out by the likes of Network Rail. In fact, it was this study. “Meeting the capacity challenge: The case for new lines” which was published by NR in 2009 that was the basis for HS2. It was the rail industry who established the need for HS2, not politicians.

Next?

“The only way of conveying the scale of Johnson’s vanity in this vanity project is to convey its opportunity cost, a projected £106bn (and rising) over 20 years.”

More cobblers. The cost of HS2 is not a ‘projected’ £106bn. Yet again Jenkins resorts to fiction as he’s just too idle and sure of himself to fact check but he’s not alone in filching figures from others without checking so I’ll cut him some slack. This number has been bandied around an awful lot in the media. That’s because the media is so incestuous as well as lazy. Nicking other people’s copy is endemic. It’s like Chinese whispers and ‘send three and fourpence, the General’s going to a dance’, an error’s circulated, magnified and becomes a ‘fact’. It’s claimed the £106bn is an ‘official’ figure because it was in the Oakervee Review of HS2. There’s just one teeny problem – the actual figure (£106.6bn) was mentioned in the review so that Oakervee could specifically dismiss it! Here’s a link to the Oakervee review. Here’s what Oakervee actually said.

Here’s what Oakervee ‘really’ said about the costs (there’s a range, not a single figure).

So, £80.7 – 87-7bn. Not figures you’ll see the press using as it’s not a single number that’s scary enough!

Jenkins then goes into the standard economic illiteracy about what spending funds for HS2 could do for the NHS, neatly showing he doesn’t understand the fact there’s no pot of money sat in the Treasury labelled ‘For HS2’ that’s waiting to rebadged, that he doesn’t know the difference between operational expenditure and capital expenditure, and thirdly, that Hs2’s funded by borrowing, not taxation. I’ve covered all those points in this blog in the past.

Continuing with his nonsensical claims, Jenkins than says;

“This one train line will consume the equivalent of Britain’s entire projected railway investment budget during its two decades of construction. Even the initial phase to Birmingham, at roughly £70bn, is twice the £40bn cost of the “northern powerhouse” rail system”

Firstly, Phase 1 is budgeted at £40-43bn (see above) £70bn is a number Jenkins has invented. Secondly, No-one knows that the UKs projected rail budget is for the next 20 years as it’s not set that far in advance. Network Rail’s budget is set in 5 year periods, known as ‘Control Periods’. The current one (CP6) runs from 2019-2024. That was set at 47bn. Of course the line between maintenance and ‘investment’ is blurred. For example, is replacing life-expired signalling with an upgraded system maintenance or investment? Here’s a link to the Department of transport’s budget 2019-2020. It makes it clear that the amount spent on Hs2 is dwarfed by what’s spent on the existing national rail network.

Oh, and that doesn’t include what others (like the Welsh and Scottish Governments, or train builders) invest in the railways either. Jenkin’s claim is simply more spherical objects..

Jenkin’s diatribe of nonsense continues with this tosh.

“Meanwhile arguments continue over the trains themselves. They are not planned to tilt, which means that any time saved on a new track to Birmingham will be lost on winding track further north. A re-signalled King’s Cross line could even get to Scotland faster. HS2 is more a taxpayer-funded theme park ride”.

*Sigh*. Where to start on this rubbish? 1. HS2’s already being built North of Birmingham to Crewe. 2. The trains don’t need to tilt to keep time as the new Hitachi Class 802s operated by Transpennine Express have already proved, (technology has moved on) plus Network Rail are proposing some track upgrades on the route to Scotland anyway. 3. Re-signalling The East Coast won’t speed it up in any meaningful way as you’d need to close all the level and foot crossings which would cost a fortune and you still wouldn’t get HS2 speed – plus – you’d devastate capacity on the route by running faster trains! This crucial factor is missed by armchair experts like Jenkins. Speed up trains on the existing main lines which are already overflowing with services and you reduce capacity as slower trains have to be ditched from the timetable to leave room for the faster ones. It’s the raison d’être for HS2, by removing those non-stop high-speed services you free up large chunks of capacity on the existing network. Jenkins ignores that crucial point because it doesn’t fit his narrative. As for the final tosh about ‘taxpayer funded’ – we’ve been over this until we’re blue in the face. HS2 is funded by borrowing against future GDP increases, not taxation!

Jenkin’s continues with his ‘vanity project’ tosh with this statement;

“What is intriguing is how HS2 has mutated from from a transport project to political machismo – “infrastructure” that is good in itself.”

Trying to label HS2 as a ‘Johnson’ project simply won’t wash – because by the time HS2 opens Johnson (hopefully) will be long gone. HS2’s been in development for over 11 years. In that time we’ve had Gordon Brown, David Cameron, Teresa May and Boris Johnson premierships. The project was kicked off by a Labour Government, taken forward by a Coalition Government and now construction’s started under a Tory Government. It’s hard to think of many schemes as apolitical as HS2. By the time the whole project’s completed that will be nearer 25 years. Who know who’ll be the Prime Minister cutting the tape when the first phase opens in 2029!

Jenkin’s final canard is this, the old “Hs2 is stealing your investment money”

“(Andy Burnham) will now find Birmingham blessed with cash that might have renovated his dire northern powerhouse rail network three times over – money he may now never see”

Playing regional mayors off against each other I see. It won’t wash. That money comes from Whitehall anyway. They make the investment choices as funding powers and budgets haven’t been devolved by the Government – much to the North’s annoyance – and that’s not exclusively to do with Burnham either. The Government set up Transport for the North but didn’t give it control of its budget. This is a Government decision but it’s nothing to do with HS2 which has a separate funding stream. Still, facts eh? You’ll never get ’em from Jenkins!

No doubt Jenkins latest pile of cobblers will keep the Grauniad happy as it’s done it’s job creating clicks and comments. It won’t stop HS2 in the slightest of course, the only effect it will have in the long term is to continue the downwards trajectory of the reputation of English journalism. Next time you see a Jenkins article on HS2, save yourself some time and file it straight in the bin…

I’ve a favour to ask…
If you enjoy reading this blog, please click on an advert or two. You don’t have to buy anything you don’t want to of course (although if you did find something that tickled your fancy that would be fab!), but the revenue from them helps to cover some of the cost of maintaining this site – and right now (because of Covid), us freelances need all the help that we can get. Remember, 99% of the pictures used in my blogs can be purchased as prints from my other website –  https://paulbigland.zenfolio.com/

Thank you!

Recent Posts

  • 22nd March picture of the day…
  • Rolling blog. Roving again…
  • 20th March picture of the day…
  • 19th March picture(s) of the day…
  • 18th March picture of the day…

Recent Comments

Paul Bigland on More right-wing tosh about Hig…
Justin McAree on More right-wing tosh about Hig…
KLS on Crazy anti-HS2 campaigner of t…
SteveP on Crazy anti-HS2 campaigner of t…
Paul Bigland on Asian adventure day 36. George…

Archives

  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • June 2013

Categories

  • 'Green' madness
  • 'Think Tanks'
  • 144e
  • 2005 London bombing
  • 2017 General election
  • 3 peaks by rail
  • 3 Peaks by ral
  • 51M
  • 7/7
  • Abandoned railways
  • Abu Dhabi
  • ACoRP
  • Adam Smith Institute
  • Adrian Quine
  • Advertising
  • Air Travel
  • Aircraft
  • Airports
  • Airshows
  • Allan Cook
  • Amsterdam
  • Andrea Leadsom MP
  • Andrew Gilligan
  • Andrew Haylen
  • Andy Burnham MP
  • Anti Hs2 mob
  • AONBs
  • Arambol
  • Architecture
  • Art
  • Australia
  • Bali
  • Bangkok
  • Bank holidays
  • Barrow Hill
  • Belgium
  • Bereavement
  • Berlin
  • Bigotry
  • Birmingham
  • Blists Hill
  • Blue passports
  • Boris Johnson MP
  • Brexit
  • Brighouse
  • Brighton
  • British Railways
  • British Railways (BR)
  • Byline media
  • Calder Valley
  • Canals
  • Carillion
  • Carolyne Culver
  • Censorship
  • Charities
  • Cheryl Gillan MP
  • Cheshire
  • China
  • Chris Packham
  • Claire Perry MP
  • Class 155
  • Class 313
  • Class 314s
  • Class 317
  • Class 320
  • Class 321
  • Class 365
  • Class 455
  • Class 456
  • Class 507
  • Class 508
  • Class 60s
  • Class 91
  • Climate Change
  • Communications
  • Community
  • Community rail
  • Community Rail Network
  • COP26
  • Corbynwatch
  • Coronavirus
  • Covid 19
  • CP5
  • Crap journalism
  • Crazy anti Hs2 campaigner of the week
  • Crazy kippers
  • Crewe Hub
  • Crossrail
  • Cuba
  • Cumbria
  • Customs
  • Cyberattacks
  • Cycle India
  • Cycling
  • Dawn
  • Democracy
  • Denmark
  • Derbyshire
  • Desiro City
  • Diary
  • Dispatches
  • Doha
  • Donald Trump
  • Doomed
  • Down memory lane
  • East Midlands Railway franchise
  • East Midlands Trains
  • Easter fairy stories
  • ECML
  • Economic illiteracy
  • Economics
  • election2015
  • Engineering
  • Environment
  • Essex
  • Eurostar
  • Euston
  • Extinction Rebellion
  • Fake News
  • Festivals
  • Film and TV
  • Flooding
  • Flora and Fauna
  • Food
  • Food and drink
  • Foot in mouth
  • Gardening
  • GBRf
  • General election
  • General election 2019
  • Georgetown
  • Germany
  • Glasgow
  • Glossop
  • GNGE
  • GNRP
  • Goa
  • Grand Central trains
  • Grant Shapps MP
  • Great Western Railway
  • Greater Anglia franchise
  • Greece
  • Green issues
  • Green madness
  • Green Party
  • Gt Missenden
  • GTR
  • Guido Fawkes
  • GWML
  • GWR franchise
  • Gwyll Jones
  • Halifax
  • Harvil Rd Hs2 protest
  • Harz railway
  • Heathrow 3rd runway
  • High Speed 1
  • High Speed UK
  • History
  • Hitachi
  • Hong Kong
  • House of Lords
  • HS North
  • Hs2
  • Hs2 Bow Group
  • Hs2 petitions
  • Hs2 Phase 2B
  • Hs2 to Crewe
  • Hs2aa
  • HS2Rebellion
  • HSUK
  • Huddersfield
  • Humberside
  • Humour
  • Hurricane Ophelia
  • Hypocrisy
  • I love my job
  • Imperial College London
  • India
  • Indonesia
  • Infrarail
  • Innotrans
  • Internet
  • Iolo Williams
  • Ireland
  • Islamophobia
  • Jacob Rees Mogg
  • Jeremy Corbyn
  • Jeremy Corbyn MP
  • Jo Johnson MP
  • Joe Rukin
  • John McDonnell MP
  • John Poyntz
  • Johnathan Bartley
  • Journalism
  • Kanchanaburi
  • Kent
  • Kuala Lumpur
  • Labour election
  • Lancashire
  • Laos
  • Law and order
  • Lazy journalism
  • Leicestershire
  • Liam Halligan
  • libel
  • Lilian Greenwood MP
  • Liverpool
  • LNER
  • Local elections
  • Local elections 2018
  • Lockdown
  • London
  • Lord Berkeley
  • LRT
  • M62 motorway
  • Major Projects Authority
  • Malaysia
  • Manchester
  • Manchester Airport
  • Manchester Victoria
  • MAPA
  • Mark Keir
  • Marketing
  • Martin Tett
  • Melton Mowbray
  • Memory Lane
  • Merseyside
  • Michael Dugher MP
  • Michael Fabricant MP
  • Mid Cheshire against Hs2
  • Miscellany
  • Modern Railways
  • Monorails
  • Music
  • Musings
  • Mytholmroyd
  • Natalie Bennett
  • National Rail Awards
  • National Trust
  • Nepal
  • Network Rail
  • Never a dull life
  • New Economics Foundation
  • New trains
  • New Year
  • New York
  • New Zealand
  • NHS
  • Nigel Farage
  • Norfolk
  • Norland scarecrow festival
  • Northern Powerhouse
  • Northern Rail
  • Nostalgia
  • Nottingham
  • Obituaries
  • Old Oak Common
  • ORR
  • Ossett
  • Our cat, Jet
  • Oxfordshire
  • Pacers
  • Paris terror attack
  • Parliament
  • Pasenger Growth
  • Patrick McLouglin MP
  • Penny Gaines
  • Peter Jones
  • Peterborough
  • Photography
  • Photojournalism
  • Picture of the day
  • Poetry
  • Politics
  • Porterbrook
  • PR nightmares
  • Protest
  • Public Accounts Ctte
  • Pubs
  • rail ale
  • Rail electrification
  • Rail fares
  • Rail Investment
  • Rail Live 2021
  • Rail Live 2022
  • RAIL magazine
  • Rail Moderinsation
  • Rail PR
  • Railfreight
  • Railstaff awards
  • Railtex
  • Railway Benefit Fund (RBF)
  • Railways
  • Rant
  • Religion
  • RFEM
  • Richard Wellings
  • Ride India
  • Road accidents
  • Rolling blogs
  • ROSCOs
  • Royal Mail
  • Royal Wedding 2018
  • RSPB
  • Rugby Observer
  • Rushbearing
  • SAIP
  • Scores on the doors
  • Scotland
  • Scotrail
  • Sheffield
  • Shrewsbury
  • Shropshire
  • Siemens
  • Signalling
  • Silly season
  • Simon Heffer
  • Simon Jenkins
  • Singapore
  • Sleeper trains
  • Snail mail
  • Social media
  • South West Trains
  • Southport
  • Sowerby Bridge
  • Spectator magazine
  • Sri Lanka
  • St Pancras station
  • Stafford
  • Stamford
  • Station buffets
  • StopHs2
  • Surrey
  • Talgo
  • Teresa May
  • Terrorism
  • Tesla
  • Thailand
  • Thameslink
  • The 'Beast from the East'
  • The BBC
  • The Big 6
  • The Daily Express
  • The end of the line
  • The fog
  • The Grauniad
  • The Great Central railway
  • The Green Party
  • The Independent
  • The Moorcock Inn
  • The Piece Hall
  • The Railway Children
  • The Rodelblitz
  • The USA
  • The Woodland Trust
  • Tilford
  • Tony Allen
  • Torquay
  • Tourism
  • TPE
  • Traffic congestion
  • Trams
  • Trans-Pennine electrification
  • Transport
  • Transport for Wales (TfW)
  • Travel
  • Twilight years
  • Twitter
  • Twitter (and how not to use it)
  • UK
  • UK steel industry
  • UKIP
  • Uncategorized
  • Vandalism
  • Victoria Prentis MP
  • Virgin Trains
  • Virgin West Coast
  • Vivarail
  • Wales
  • Walking
  • Warwickshire
  • WCML
  • Weather
  • West Yorkshire
  • Wigan
  • Wildlife Trusts
  • Worcester
  • Work
  • World War 1
  • World War Two
  • Yorkshire
  • YorkshireStopHs2

Meta

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.com

Blog at WordPress.com.

  • Follow Following
    • Paul Bigland
    • Join 406 other followers
    • Already have a WordPress.com account? Log in now.
    • Paul Bigland
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...