• About

Paul Bigland

~ Blogging on transport, travel & whatever takes my fancy.

Paul Bigland

Tag Archives: Railways

Rolling blog: all dressed up with somewhere to go…

19 Thursday Sep 2019

Posted by Paul Bigland in London, National Rail Awards, Railways, Travel

≈ 1 Comment

Tags

National Rail Awards, Railways, Travel

07:30.

I’m packed and ready to head down to London for tonight’s National Rail Awards. It’s going to be a long day but it’s always a great event and chance to catch up with friends from the industry as well as watch others get well-deserved awards for their hard work and service to the industry. Dawn is already ‘down South’ so we’re arranging to meet before going to the hotel to prepare. The cufflinks and bow-tie are all packed and the shoes polished, so let’s see how the day goes…

08:20.

Walking to the station with the Calder Valley hidden beneath a thick layer of cloud.

09:05.

After walking to Halifax station I’m now on stage 2 of the journey aboard Northern’s 09:00 to Leeds. It’s a York service made up of a 2-car class 158 instead of the more normal 3-car, so it’s already busy. This is one of the unrefurbished sets, which is clean, but tired.

09:20.

After our reversal at Bradford Bradford Interchange where a sizeable chunk of folk deoarted I extricated myself from the luggage shelf and found a seat before the next horde boarded. We’re already full and standing but we’ve still got two more calls before Leeds including New Pudsey, which is always busy. This coukd get cosy!

The murk that covered the Calder Valley is totally absent here. Instead, we have clear, crisp blue skies without a hint of cloud.

10:40.

I’m now flying down the East Coast Main Line (ECML) aboard one of LNER’s old Mark 4 sets pushed by a Class 91 locomotive named “Skyfall” after the James Bond film. We’ve just rushed through Retford at 119 mph and show little sign of slacking. I’m in the quiet coach at the back of what’s a very busy train, but here I’ve managed to find an unreserved table to set up my laptop on and crack on with some work. The weather outside remains stunning – I actually wish I was out with the camera, making the most of it!

11:05.

We’ve just been brought to a stand at Helpston, North of Peterborough, which I assume is because of congestion at the station. We’re on the move again now but crawling along to the next signal at a sedate 17mph. I’ve just taken the time to have a wander through the train to use the loo and noticed how tatty these Mk4 sets are getting now that they’re in their final months of service. The loo door wouldn’t shut properly and the lock was decidedly dodgy. Belay the congestion bit, the Train Manager’s just been on the PA to explain our speed is due to a trespasser on the line. At least our slow speed is giving me time to admire the construction work on the new Werrington dive-under. I must get down here to photograph is properly soon.

11:30.

We called at Peterborough and now we’re accelerating across the Cambridgeshire Fenlands running 10 minutes late due to the trespass incident. The trip recorder on my phone is showing us hitting 123 mph right now as we flash through Huntingdon, leaving the station a blur…

12:53.

Despite the dekay I had plenty of time to stroll from Kings Cross to Euston in the glorious sunshine before catching the tube to Waterloo. Now I’m wating for Dawn’s train from Farnham to arrive…

16:05.

After meeting up with Dawn in Waterloo we nipped down to Roupell St for a ‘swifty’ in a time-warp area of London hidden in the shadows of Waterloo East’s elevated platforms. It’s an area I knew well from my days living in London as a friends mother lived here and I helped redecorate her house.

The interior of the Kings Arms in Roupell St.

Moving on we decided it was far too nice a day to be stuck on the tube a minute longer than we had to be so we walked back to Embankment tube via the South Bank and the footbridge at Charing Cross. The view was stunning.

Now we’re in our hotel in Bayswater, getting changed for tonight’s black-tie event.

Rolling blog: another escapade…

18 Wednesday Sep 2019

Posted by Paul Bigland in Railways, Rolling blogs, West Yorkshire

≈ Leave a comment

Tags

Railways, Rolling blogs, West Yorkshire

17:35

Having been too busy sorting pictures out at home for a client whilst eyeing the indifferent weather, I’ve finally made it out of the house for a few hours in order to get some exercise – and a few pictures.

Now that the nights are drawing in other photographic oportunities arise, such as dusk or nightime long exposure shots. With that in mind I’m heading over to Bradford for a little while in the hope of capturing some. Let’s see how it goes…

18:08.

I’m now on a half-empty Northern Rail service bound for York as far as Bradford. This 3 car train will have carried commuters home from Preston to Blackburn and the Lancashire towns before heading across the Pennines. At Bradford it became busy again with folk hwading to Leeds, whilst I decamped to see if there were any decent shots in the offing…

19:02.

Sadly, things haven’t panned out due to a combination of clear skies and too many Pacers and other trains in the old Northern livery, so I’m moving on to Leeds – and possibly Huddersfield. I’ve got a coupke of usable shots ‘in the can’ as it were, but not what I’m after. This location would be better on a wet winter’s night. I’m heading to Leeds on another of Northern’s unrefurbished Ckass 158s which is almost empty, i’m not used to this as I’m not normally swimming against the tide but caught up with the flow of commuters heading home from Leeds! It certainly makes a pleasent change.

20:47.

I’m now in Huddersfield and heading home, having finally got the type of picture I wanted. There’s plenty of opportunities at Leeds and I’ll return later when the nights have drawn in more but I need a pitch black night there for what I had in mind. Huddersfield proved to be a challenge due the old-style lighting installed on the platforms which flares quite badly, but other shots and angles were available which worked – as you’ll see later. Right now I’m spending the next half an hour on this!

It’s midnight and time for bed, but I thought I’d add just a couple of pictures from tonight’s foray.

A pair of Pacers compete to enter Bradford Interchange. The leading unit is working from Leeds to Huddersfield, the unit in the background in the opposite direction. Both will reverse here. The line to the right is to Halifax, that to the left to Leeds.

Two TPE trains cross at Huddersfield,

The UK’s ‘green’ movement isn’t fit for purpose.

17 Tuesday Sep 2019

Posted by Paul Bigland in 'Green' madness, Green madness, Hs2, Railways

≈ 2 Comments

Tags

'Green' madness, Hs2, Railways

It’s been one of those days where just opening a single newspaper has highlighted why the UK’s ‘green’ movement simply isn’t fit for purpose. They’re more part of the problem, not the solution. I say this with a huge amount of regret as I see myself as someone with a real concern for the environment with a fear of what we’re doing to the planet, but the past few years has seen me look at these groups with fresh eyes.

Let me explain. I saw a paper copy of yesterday’s Guardian earlier. On one page it carried a story reporting on a new report from the Office of National Statistics that says traffic on our roads has increased by 33% in the past 30 years. Here’s a link.

The article by Gwen Topham quoted someone called Jenny Bates, from (what are supposedly) ‘Friends of the Earth’, who said “Despite noise made by vehicle manufacturers about cleaner petrol and diesel technology, transport is still the most climate-polluting sector and it’s clear petrol and diesel sales have to stop as soon as possible…The only way to stop transport from leading us to further climate breakdown is to drastically cut the miles travelled by car. Cleaner options such as bicycles, buses and trains need to be made more accessible and more affordable” .

Perhaps FoE could explain exactly how they propose we can do this when they actively oppose building the high-speed 2 railway (HS2), the only way our increasingly overcrowded rail network will ever be able to cope with a modal shift from road to rail?

To add insult to injury and highlight just how much environmental groups in the UK have totally lost the plot, the opposite page carried a piece on how the Woodland Trust have secured delays to clearing some of the tiny pockets of UK woodland that will have to be cut down to make way for HS2!

I mean, seriously? They’re going to take the fundamentalist approach that ignores the bigger picture? Every single tree and patch of UK woodland is inviolable. Forget tackling global climate change if it means a single hectare here has to be sacrificed for the greater good…

This is why I’ve no time for UK environmental groups like the Woodland Trust or ‘Friends’ of the Earth. They’re not part of the solution, they’re part of the problem. They’ve no real answers to anything. In fact, they oppose the only workable solution we have to vastly increase capacity on our railways and tackle Co2 emissions from transport! This is through the looking-glass stuff! The road lobby and oil companies must be pissing themselves laughing at the way ‘Green’ groups are doing their job for them. What annoys me is the mealy-mouthed statements we get from these groups, where they say “Oh, we’re not opposed to high-speed rail in principle” (just don’t ever try to build it in practice, because we’ll scream blue murder!).

I’ve written about the hypocrisy of the Woodland Trust in this matter before here. Since then, myself and a few other people have been doing some digging and it turns out their hypocrisy verges on the downright dishonest. I’ll be blogging about that in greater detail soon. So, next time you get bombarded with requests for money from these people via Facebook or whatever, just pause for a moment and wonder, are they really offering any solutions, or are these campaigns just a cynical way to raise more money?

Meanwhile, here’s an illustration of the problem. These are the Medway viaducts in Kent, where the M2 crosses next to HS1.

The M2 requires two massive viaducts, each one far wider than that used by HS1. In the background you see an electric train capable of 140 mph that can carry 352 people seated (and many more standing). Unlike the 60-70mph vehicles on the motorway, it can be carbon-neutral. Yet (supposedly) green groups oppose this as a way to link our major cities! Madness, utter madness…

Rolling blog: on the run…

13 Friday Sep 2019

Posted by Paul Bigland in Railways, Rolling blogs, Travel, West Yorkshire

≈ 2 Comments

Tags

Railways, Rolling blogs, Travel, West Yorkshire

08:40.

The skies are blue today so I’m making a bid for freedom from the office to head out hunting some of the new Northern trains that were introduced into public service from Monday. The Class 331 electrics have spread their wings from operating solely on the Leeds to Doncaster route. They’re now on diagrams between Leeds, Bradford and the Aire Valley services. They’re also out and about on the Blackpool North to Liverpool Lime St route, displacing more old diesel units to allow more Pacers to head to the scrapyard. I’ll update this blog throughout the day. Let’s see what happens and where I get to…

10:35.

I thought I was being clever by hitching a lift into Huddersfield with Dawn, but it’s all gone pear-shaped at the station. Track-circuit failures at both East and West mean hardly anything is running to time. Delays are averaging 15-20m. My next service to Leeds is 16m late, leaving me lots of time to admire Northern’s shiny new Class 195s which are stood idle in the sidings.

11:08.

My trip to Leeds was spent standing in a vestibule aboard a 3-car Class 185, so no change there then! The service was busy with holiday makers including a gaggle of middle-aged professional women who were already on the Prosecco, but they were very well behaved, so no bother to anyone. Once in the city I caught the first available train for the Aire valley, the 11:12 to Bradford Forster Square which is worked by a refurbished Class 333. In fact it’s the first of the class – 001!

11:30.

My first port of call was the new station at Kirkstall Forge, a brownfield site that’s rapidly redeveloped. As I stand here all I can hear is the clanking of catapillar tracks and the warning horns of earthmovers. A new 7-storey office block immediately outside the station’s already open for business.

12:18.

I’ve moved on a couple of times now, first tk Shipley, then down to Bradford Forster Square for a brief photographic stop before returning to Shipley, which is a rare beast on the UK rail network. It’s a station built in the middle of a triangle of railway lines that has platforms on each side of the triangle. Only one other exists, at Earlestown on Merseyside. There did used to be several others, including nearby Queensbury, but they’re long gone. Shipley still has 5 out of the original 6 platforms as well as an old Midkand Railway station building which contains a booking office and traincrew depot.

14:10.

After several stops heading West up the Aire valley I’ve pitched up in pretty Skipton for lunch.

Frustratingly, the only Class 331’s I’ve found are all here – laid up in the carriage sidings! On the bright side, I’ve git several decent library/client shots and recorded the imminent demise of the trains Northern will be surrendering – the BR built Class 321/322s, known affectionately as “dusty bins”.

Skipton still retains most of its classic Midland Railway platform canopies

They have an interesting history. The Class 321/9 fleet were bought by the local passenger transport Executive especially for Aire Valley and Leeds-Doncaster services. The 322/4s have had a peripatetic existence. Originally built for ‘Stansted Express’ services from Liverpool St in London, they were displaced and ended up in Scotland where they worked Edinburgh – North Berwick services. Displaced once again, they ended ul being transferred to Leeds Neville Hill depotto strengthen services in the Aire Valley.

15:02.

Having ‘acquired’ copies of the two diagrams Class 331s are meant to be operating it’s clear that there are a few issues. I’ve found one running at Skipton but that’s on a training run to Shipley, which is where I’m going to head for as almost everything passes through there!

16:37.

Despite my best efforts 331s in traffic proved elusive. Services were’t performing well today so it was very muuch the luck of the draw. However,  my luck did hold at Keighley where I managed an interesting historical comparison which I’ll upload this evening. As it’s Friday I called it a day early and headed into Bradford. A sprint between the two stations meant I made the 16:30 from Interchange back to my starting point in Huddersfield. It’s worked by one of the Pacers formerly based up at Heaton in Newcastle, so I’ve a vintage ride home and chance to enjoy one of these old workhorses before it takes its final trip to the scrapyard.

Analysing another load of anti Hs2 tosh…

10 Tuesday Sep 2019

Posted by Paul Bigland in Hs2, Railways

≈ 28 Comments

Tags

Hs2, Railways

Regular readers may know that I’ve a cynical streak when it comes to academics. Sadly, there’s a number of them who seem to think their undoubted expertise in specific fields makes them a sage on all things, including complex subjects they know absolutely nothing about – not that this stops them pontificating!

The latest to come to my attention was this load of unmitigated tosh from Professor Dieter Helm, who’s an economist and lecturer at the University of Oxford and also an advisor to the Government.

Sadly, the professor seems to think that his knowledge of economics means that he doesn’t need to do any proper research when it comes to writing about the railways and HS2. If he had, he would have been very quickly dissuaded from writing the nonsense he’s produced. He starts badly, then rapidly goes down hill from there!

Here’s his opening stance:

“What is the question or questions to which HS2 is supposed to be an answer?” Do go on? “When it comes to HS2, the search for a justifying rationale has gone through many episodes. Only one, the original idea, has some merit, but HS2 is no longer an answer to it.” Really? And that original idea was what, exactly? “The original idea, the good one, was to integrate the UK into a European increasingly interconnected high-speed network” Err, Professor, if you’d bothered to do the slightest bit of research you’d have known that’s complete cobblers. Helm is talking about the link between HS1 and HS2 that was dropped by the Higgins review back in 2014.

In fact, that was never “the original idea” at all. HS2 came about because the then Labour Government asked Network Rail to look into the need for new rail capacity. The study, “Meeting the capacity challenge: The case for new lines” was published in 2009. Here’s a link to it. But the idea wasn’t new even then. An earlier feasibility study by W.S. Atkins was commissioned by the Strategic Rail Authority in 2001.

the 2009 Network Rail study considered four corridors and came to the conclusion that the best value option and the one that addressed future capacity constraints was a new high-speed route from London to Scotland.

Note that there was no mention of a link between the new line and HS1. This came about later.

The Network Rail study was the basis for HS2. It was taken forward by the Labour Government under Lord Adonis who’d already set up HS2 Ltd. HS2 Ltd reported back at the end of December 2009 and the then Transport Secretary, Andrew Adonis, published the Government’s response in a Command Paper, ‘High Speed Rail’, in March 2010. It was only then that a possible HS1-HS2 link was suggested as an option. It was never the “original idea” at all. That year, Labour lost power and the new Government confirmed the HS1-HS2 link as a firm proposal, until it became obvious it was a non-starter.

So, Helm’s fallen at the first hurdle. Let’s have a look at some of his other claims. Having got the first one badly wrong he claims that

” First, it is not true that the existing lines could not be upgraded and carry more capacity. Railways are basically empty for almost all of the time, and the distance between and number of trains depends upon stations and signalling.  Standing on a mainline station platform at say Didcot Parkway, staring at the empty lines, reflects the fact that for most of the time there are no trains”.

Where to start with this nonsense? No-one has claimed that existing lines can’t be upgraded. Clearly, Helm has no idea that we spent £9bn upgrading the West Coast Main Line just 12 years ago! The point is that upgrading the Victorian network is complex, expensive and disruptive and it adds very little extra capacity compared to building a new high-speed line!

The next one’s even more laughable! Railways are “basically empty for almost all the time” Are you serious? This is weapons-grade nonsense. As for standing On Didcot Parkway, what on earth is that meant to prove? The levels of ignorance of how railway capacity actually works here is stunning. It would be laughable from an ordinary member of the public, but this man’s an Oxford Professor!

OK, let’s have a look at those ’empty railways’ in the real world. Here’s a copy of today’s actual train workings from ‘real time trains’ for Roade, which is on the two track section of the West Coast Main line South of Rugby. This is the section that phase 1 of HS2 is designed to relieve. This is what passed between 07:00 and 08:00 this morning. A note for those unfamiliar with this, the times in the two right hand columns show first the working timetable times, then the actual time the train passed.

There were 31 trains out of 32 scheduled, as one was cancelled. There’s 16 trains heading for Euston alone, that’s roughly one every four minutes. Some “mostly empty” railway, eh? Right, let’s have a look at the next bit of nonsense.

“Few mainlines carry trains less than 10 to 15 minutes apart. Existing lines could be upgraded, and they have the great merit of already existing and require much less extra land and demolitions that the new line must have. For £100 billion, the existing rail network could be upgraded almost everywhere, with comprehensive modern signalling, station enhancements and a coherent fibre enabled communication system to run it“

Yet again the Prof falls flat on his face in the first sentence. How many other main lines do I need to provide real-time running information to expose this nonsense on stilts? Has the Prof any idea of how much of our railway network HAS already been upgraded over the past few years, or how the fact Network Rail’s spending record amounts doing more?

How does any of this remove the need for HS2? It doesn’t. For example rebuilding Reading at a cost of £1bn a few years ago has done nothing to add capacity to the WCML, only HS2 can do that. OK, let’s plough on.

“Far from dispersing growth to the north from the south, it could easily work the other way around. Furthermore, it is not obvious that the economic growth problem in the north is caused by lack of connection to London, or that the £100 billon spent on HS2 is the best way of increasing the northern growth rate”.

Here we see the usual obsession with London, ignoring all the other places HS2 connects. But let’s tackle this one head on as I’m a perfect example of why this is a fallacy. I live in West Yorkshire but I often work in London. Where do I spend the money I earn in London? Most of it in West Yorkshire, where I live, not where I work. When I get the morning Express to London and home in the evening there are hundreds of other Yorkshire folk doing exactly the same, only now it’s getting increasingly difficult to work on the trains as they’re full. If I get the Grand Central service from Halifax to Kings Cross I’ll be lucky to get a seat, even in First Class, making me less productive. This is the difference between economic theory and reality. Right, next..

“Promoting the economic growth prospects in the north is much more about connectivity within the north” The Prof seems blissfully unaware this is exactly what HS2 does. If we take “the North” as being out of the M25! The current rail services between Birmingham, Leeds and Manchester are slow and not fit for purpose. HS2 will cut journey times between B’ham and Manchester by 52% and B’ham and Leeds by 58%! It will make a huge difference in connectivity between those major cities – and many more.

“In transport, there are two main alternative options. The money could be spent on upgrading the existing rail network, with smart signalling and metering, and smart system coordination, better smarter stations, better access to stations, more and better stations, and better rail lines”.

Frankly, some of that doesn’t even make sense. What on earth is “smart signalling and metering“? If he’s referring to digital signalling like ATO, he’s clearly unaware of the limited capacity gains it offers on mixed traffic railways like the West Coast Main Line (the busiest in the EU). It’s estimated by signalling experts that digital signalling could offer around 15% extra capacity on mixed traffic lines. At the current rate of growth, that would be eaten up in just a few years. Then what? We’re back to square 1. In contrast, HS2 offers a massive capacity increase by moving non-stop express trains off the existing lines onto dedicated lines where digital signalling really can help because all trains are running at the same speeds. It also frees up lots of capacity on our existing network. Not just on the WCML but also on the East Coast and Midland main lines.

” If autonomous electric vehicles develop, controlled by smart systems, and powered by low carbon electricity generation, then roads may be better than rail in the future, having greater flexibility and able to take denser traffic.”

“If”? We need solutions now, not play wait and see! As it is autonomous vehicles have been overhyped and underachieved. I may not see eye to eye with the commentator Christian Wolmar on HS2, but he’s done some excellent work debunking the hype around driverless cars. Even “if” they did arrive there’s no way we’d be seeing what the Professor is suggesting as every vehicle on the road would need to be autonomous before you’d see this pipe-dream happen. But just say it did. Electric vehicles are still far more polluting than trains. Oh, and how an electric car carrying a max of 5 people and limited to 70mph will be ‘better’ than a 200mph train carrying 1100 is stretching reality to breaking point. This is no ‘alternative’ to HS2.

Finally, we get this old cherry.

“If the counterfactual is the infrastructures more generally, then the first candidate would be fibre and broadband. This would cost less than £100 billion to complete and one of its impacts would be to reduce the need to travel and hence the demand for travel.”

Really? As we’ve had fibre and broadband for many years now, perhaps the professor could say when it’s ever reduced travel demand? Rail passenger numbers are still growing and hitting record numbers. Here’s West Coast operator Virgin trains figures. Virgin has grown passenger numbers from 30.4m in 2012-13 to 38.3m in 2017-18, an increase of 25.98%!

Here’s the statistics for the other West Coast operator, West Midlands Trains. They’ve grown numbers from 60.5 million in 2012-13 to 74.9 million in 2017-18, that’s a growth of 23.8%. So much for broadband reducing travel…

In fact, it’s arguable that improved wireless communication and technology has helped increase, not cut, travel as less and less people are tied to their offices – hence so many people working on trains! OK, next…

“It is hard to avoid the conclusion that the future is more likely to be cars and vehicles than trains”

No, it’s really, really not, this is more nonsense on stilts. High-speed rail is the land transport of choice in the 21st century, which is why so many countries are investing in it. China has built 25,000 km already in just a few short years. Now we have Saudi Arabia, Turkey, Russia and Morocco added to the list. Soon there’ll be Indonesia, India, Thailand the USA and many others.

Like the professor, I could go on, but there’s little point. I think my job here is done. It’s a great shame when academics get so carried away with themselves they trot out stuff like this. I could call it badly-researched, but it’s not. It’s hard not to draw the conclusion that he’s done no research at all.

Mytholmroyd station building. A look inside…

06 Friday Sep 2019

Posted by Paul Bigland in Calder Valley, Community rail, History, Mytholmroyd, Railways, West Yorkshire

≈ 1 Comment

Tags

Calder Valley, Community rail, History, Mytholmroyd, Railways, West Yorkshire

I’ve been meaning to blog about this for ages but never had the time. Today’s miserable weather’s put a damper on other photographic activities as it’s chucking it down here in the Calder Valley so I’ve finally found the opportunity.

Some of you may have noticed the old station building at Mytholmroyd as you passed by on the train. It’s on West end of the Leeds bound platform. What you may not have appreciated from the train is just how big a building it is! Here’s how it looked from the platforms in April 2015.

Here’s a recent view showing what it looks like from ground level. In effect it’s two buildings. The back part of the building (to the left of the drainpipe) was the stationmasters residence. The public part of the building is to the right of the drainpipe.

It’s spread over three-floors and there’s a warren of rooms inside. Built in 1871 by the Lancashire and Yorkshire Railway, it was given a grade 2 listing back in 1984 when it was closed by British Rail. It’s been derelict for over 30 years but the friends of Mytholmroyd station have been trying to get it reopened as a community space and waiting rooms ever since 2007. It was a long process as the building is owned by Network Rail. In 2015 the station building was specifically included in the successful Arriva North Franchise Agreement, which stated that (no later than 2025) the franchise shall ” redevelop for social use redundant or under- utilised buildings at stations including Mytholmroyd and Cottingham”.

With that commitment agreed, negotiations continued with various interested parties, including the Railway Heritage Trust. The original group of station volunteers was joined by representatives from the local community and a Northern Rail director; and an application for Charitable Incorporated Organisation (CIO)  was granted in September 2017.

The negotiations culminated in work commencing in March 2018 by Network Rail contractors CPMS who removed asbestos and made the building safe in preparation to repoint and plaster parts of the interior. Local interior designers JSB Ltd assisted with the restoration of the original woodwork, fireplaces and windows.

Northern Rail is planning to include the building within their (operational) station lease from Network Rail. The Station Partnership and CIO would have a licence from Northern – with no responsibility for building maintenance etc.

Northern are planning a public Waiting Room and toilet on the second floor with access from the station platform. They would welcome suggestions for a small trading outlet within the building that would be relevant for rail passengers and be suitable for the general community/social use concept.

Northern envisage that the operation of the building will be through a Management Board consisting of themselves, the Station Partnership together with the CIO and users / tenant(s).

Proposals include –

Second Floor – step-free access from the station platform. Welfare accommodation for Northern Rail staff. A General Waiting Room – which may include an Art Gallery and station history display. Toilet. Rooms for Railway Education project.

First floor – steps only access. Studios for local artists and office/meeting room for Station Partnership, the CIO and the building Management Board.

Ground floor – step-free access. Flexible use which could include a small trading unit, a Reading Café incorporation of a library, meeting/conference facilities including a small catering area. Secure storage area for the Station Partnership equipment including an accessible water supply.

In March 2019 the first phase of the restoration of the building was complete. In May I was lucky enough to be invited along to have a look inside. Here’s what we saw.

The tour group gather in the booking hall on the ground floor as Geoff Mitchell from the station friends group gives us a run-down on what’s been happening with the building.
Looking behind me from the last picture. The wooden structure to the right is the old ticket office. Note the original stone steps leading to the second floor. The restoration work has been done to a very high standard.
Here’s the original ticket office desk which was still in-situ. It’s been cleaned and restored.
Climbing the stairs from the ground floor.
One of the top-floor rooms that have a doorway out onto the platform. This one is on the street side of the building. You can see the way it’s changed uses over the years.
Looking to the right of the previous pictures you can see through to the other top-floor room that opens out onto the platform. Some of the original plasterwork and paint colours remain.
One of the top-floor stone fireplaces that have been lovingly restored.
Another of the fireplaces. None of us could work out what the wooden framework above had been used for.
One of the rooms in the old Stationmaster’s residence.
One of the winding staircases in the old stationmaster’s residence. This side of the building had been abandoned since the last stationmaster had departed.
Shadows and light on exposed brickwork.
The ground floor of the old stationmasters side of the building had been altered over the years with one of the walls having been taken out to give access to the exterior hoist up to the Leeds bound platform. Thousands of chickens were shipped through here in the days of the railways being a general carrier. A goods train would pull up at the platform and boxes of chickens would be loaded straight onto it. Now the lift has gone and the doorway’s been bricked up as part of the restoration.
A view taken from the yard outside where the lift used to be. The quality of the restoration work is evident.
Another relic that remained on the premises. The station safe!

Time in the sun.

05 Thursday Sep 2019

Posted by Paul Bigland in Pubs, Rail Investment, Railways, West Yorkshire

≈ Leave a comment

Tags

pubs, Rail Investment, Railways, West Yorkshire

(Updated 23:00)

I managed to escape from the office again today as I’d arranged to meet a fellow photographer who works in the rail industry to give him a guided tour of locations around Marsden on the Trans-pennine rail route through the Colne valley. I’d been meaning to update my library shots and get some pictures for a client from the area, so this was the perfect opportunity – especially as the sun Gods were smiling upon us.

Trevor and I met on the train at Huddersfield for a trip on a line that (as a man of Kent) he’d not travelled on for donkey’s years. Our first port of call was Marsden, the nearest station to the famous Standedge tunnels, where canal and rail occupy almost the same ground under the Pennines. It’s a fantastic photo location but one that will change dramatically over the next few years when the rail route is electrified.

The only downside nowadays is the monotony of the type of trains. Very little freight uses the route as it has such an intensive passenger service. This is Trans-Pennine Express’s core route. Northern Rail used to operate an hourly all-stations Huddersfield-Manchester service but it’s now operated by TPE. This means the line’s almost completely Class 185 operated which is why the introduction of the TPE’s loco-hauled sets is a welcome break from the monotony.

Having trudged up the incline to a spot above the tunnel entrance the sun smiled, and so did we, as we managed to get a range of pictures in decent weather. Here’s an example.

A TPE Class 185 heads East towards Marsden station which is around a quarter of a mile to the right of the picture. The bridge in the foreground’s an aqueduct which has been rebuilt and renewed by Network Rail. It’s been raised to give sufficient clearance to the overhead wires which are due in the next few years when the line between Leeds and Manchester’s electrified.
A zoomed-in shot from the same location, showing the aqueduct in greater detail. The formation to the right carried tracks through the original single track Standedge tunnels which were built in 1848 and 1871. The present double track rail tunnel was built in 1894. Just behind the train is the Huddersfield narrow canal, its tunnel was opened in 1811. You can learn more about these feats of engineering here. If you’re in the area, I’d recommend the tunnel café and the museum. Both are in the canal basin and a short walk from Marsden station.

Having exhausted the photographic possibilities we changed locations a couple of times to catch one of the new CAF built trains for Northern which was working empty stock from Preston to Huddersfield.

In doing so we missed one TPE’s new Nova 3 sets as we didn’t know the damned thing was running! Here’s the classic view we’d been heading for.

A Manchester bound TPE service approaches the Standedge tunnel. The canal museum and visitor centre I mentioned earlier is in the old transhipment shed to the right of the picture.

By that time the Pennine weather had changed from favourable to fearsome, with cold air and showers sweeping in from the West, so we adjourned to the Riverhead Brewery Tap pub in Marsden, which is a cracking place to stop for a pint before heading back East

Back in Huddersfield we connected with the loco-hauled TPE set we’d missed earlier. Well it would have been rude not to!

Trevor used it to get to Leeds before heading off to Keighley whilst I stayed on as far as York as I couldn’t resist the opportunity to get shots of the set under the magnificent station roof. Luckily, a late-running Siemens set allowed me some nice juxtaposition and a study in front ends.

All in all it’s not been a bad day and a lot less frustrating than yesterday. There’s some useful shots in the bank and for a client. I’ve had chance to explore locations I’ve not visited for a while and I’ve also been able to act as a tour guide for a friend. What more can you ask for?

Rolling blog: bunking off…

04 Wednesday Sep 2019

Posted by Paul Bigland in Railways, Rolling blogs, West Yorkshire

≈ Leave a comment

Tags

Railways, Rolling blogs, West Yorkshire

15:45

After two days in the office I’ve bunked off for a few hours. I needed to nip out for some shopping anyway but then I noticed that Northern Rail were running training runs on their new Class 195s between Bradford Interchange and Todmorden. As there’s also a fair bit of freight working today and we’ve got some very moody skies I thought I’d chance my arm and get a few pictures. The results will be in the lap of the Gods as there’s a fair chance heavy showers rather than sunshine will co-incide with the trains, but you never know!

I managed to stay dry walking down into Sowerby Bridge before catching a Northern 2-car 150/2 to Hebden Bridge working a Blackpool North service which is normally the exclusive preserve of their Class 158’s, which suggests that something’s gone pear-shaped with the fleet.

All the way to Blackpool on one of these? Nice…

15:55.

The law of Sod has come into play. No sooner had I landed at Hebden Bridge than I found today’s test runs had been cancelled for no explained reason. On the bright side, there’s still a couple of freight services running but I’m not in the best place for pictures. Ho hum…

16:45.

Well that was a bit of a waste of time! Not a single thing fell right. I ended up heading back to Sowerby Bridge and just for a moment I thought I might be able to grab a shot of ny departing train framed by a gorgeous rainbow – which promptly faded just as soon as the train departed! All that was left was the chance to get a shot of a biomass train heading for Drax power station – just as the next shower arrived! I’ll add a couple of pictures later, right now I’m going to salvage something from the day by getting some shopping and my daily 12,500 steps in…

21:13.

Time to wind things up. Part of me wishes I’d stayed in the office now and ploughed on with other stuff. But as the old saying goes “nothing ventured, nothing gained”. The weather and operations just didn’t fall right. still, here’s a couple of useful photo’s that salvaged the time.

I live the way the Knowsley to Wilton waste train snakes around the reverse curves at Sowerby Bridge. You need a freight train of this length otherwise the shot doesn’t work.
Ex- West Midlands Class 150105 pulls into the delightfully period station at Hebden Bridge with a service from Manchester Victoria to Leeds. Note that the unit carries the name ‘Bernie’ under the unit number. I’ve no idea why so I’m hoping a reader may be able to enlighten me.

Whilst I was unlucky with the weather, a friend further East wasn’t as conditions fell perfectly and Tony knew what he was doing to take advantage of them. He should be well pleased with this shot! I’m not jealous really, honest!

Right, I’m now back at home, editing pictures and watching the Tory party implode over Brexit whilst realising that they’ve elected a blustering clown as a Prime Minister. Tomorrow I’m hoping to have a day out with the camera and a colleague. Hopefully both trains and weather will play ball tomorrow…

HS2. Opening dates extended and the budget’s revised, but nothing’s been cut.

03 Tuesday Sep 2019

Posted by Paul Bigland in Allan Cook, Railways

≈ 2 Comments

Tags

Alan Cook, Hs2, Railways

As widely trailed in the media, today, the Chairman of Hs2 Ltd, Allan Cook has published his report and advice about the deliverability of Hs2. You can find the report here. Despite much of the media speculation and froth on social media, the report contains no surprises. The review has looked at what’s been happening since the project was first launched back in 2009 and updated plans in the light of events. It’s no admission of failure, merely a pragmatic response to changes in circumstances due to a whole range of issues. It’s also taken on board valuable lessons from the difficulties at Crossrail and other major projects. There’s little that’s new. For example, the question of extending the construction timetable was suggested quite some time ago by the National Audit Office.

Here’s some of the more important points from it.

“As such (HS2) is an integral part of the plans of Transport for the North, Northern Powerhouse Rail (NPR) and Midlands Connect, providing 50% of the new lines needed by NPR. However, the scale and the complexity of the task, as well as the transformational benefits it will deliver for the country and its regions were under-estimated in the original business case.
The original plans did not take sufficient account of the compound effect of building a high-speed line through a more densely populated country with more difficult topography than elsewhere – and doing so whilst complying with higher environmental standards.
Equally, the existing cost/benefit model, which was designed for smaller scale schemes, has proved inadequate in capturing the full transformational effect of HS2, particularly on changing land values. This transformation is already being demonstrated in Birmingham.
Therefore, the budget and target schedule for the programme have proved unrealistic, while at the same time the benefits have been understated”.

Cook goes on to say that..

“Phase One from Birmingham to London is already under way and should be completed as planned. HS2 conducts its business as a cost-conscious organisation with value for money playing a huge factor in decision-making. Though much work has been done to date to drive down costs through independent reviews and pilot studies, the cost is likely to rise from £27bn1 to a range of £36bn to £38bn; and the target delivery date of December 2026 should become a more realistic, manageable and cost effective staged opening between 2028 and 2031.
Phase 2a, from Birmingham to Crewe, is currently near the end of its legislative process in Parliament. That process should be completed and amalgamated with Phase One and delivered to the same timescale. Its cost is likely to rise from £3.5bn to a range between £3.6bn and £4.0bn”

So, phase 1 and 2a will open together. And phase 2b?

“The hybrid Bill for Phase 2b running from Crewe to Manchester and Birmingham to Leeds is currently being prepared and is, therefore, the least mature of the Phases. Given its early stage and its essential role in delivering Northern Powerhouse Rail, Transport for the North and Midlands Connect, there is an opportunity to fully integrate the plans for each region and deliver them in smaller, more manageable sections as part of a rolling programme of investment in the Midlands and the North. In line with the experience of Phase One, the cost of Phase 2b is likely to rise from £28.6bn to a range of £32bn to £36bn with target delivery moving from 2033 to between 2035 and 2040″.

Moving on beyond the executive summary there’s some very interesting details in the report. What’s now proposed is the have a phase 1 ‘soft opening’ where trains will be run as a captive service, staying on Hs2 metals and not running onto Network Rail tracks.

“The target date for Phase One services is set at December 2026 in the Development Agreement, with Baseline 6.1 (described on page 17 below) introducing the concept of staged opening (3 trains per hour (tph) between Old Oak Common and Birmingham Curzon Street in December 2026 and 10tph between Euston and the North West in December 2027).
The staged opening approach, with an initial captive service with no interaction with the existing rail network, follows good practice of introducing services gradually and minimising integration risks while operational experience and reliability are built up. As a captive service, this can be introduced when the systems are ready and proven (a “soft start”) and does not require a change to national timetables
“

One of the reasons for postponing the opening date is keeping costs down on embankment building, as the report explains.

“allowing additional time for ground settlement in preference to costly ground stabilisation prior to installation of high-precision concrete slab track” (pge 15).

The report goes on to mention that one of the reasons for the extension of the opening date of phase 2b is the Parliamentary timetable.

“The opening of the full HS2 “Y” network was considered, in 2014, achievable in around 2033. As well as being a long-term forecast, this was based on Royal Assent by 2020 for a Phase Two hybrid Bill.
In Baseline 1, Royal Assent was to be in October 2022 (with Bill deposit in September 2019). And in the emerging schedule, Royal Assent is set at Dec 2023 (based on a Bill deposit in June 2020).”

Yet again, this is just a pragmatic view and reflection of events in the real world. So, what about all those crazy figures that we’ve seen thrown around by opponents of the project? Is the cost of Hs2 really estimated at £100bn now? No. It’s between £72.1bn to £78.4bn (pge 33).

There’s a lot else in the report, which needs to be read in detail, but it produces some interesting figures, although a lot of sensitive commercial detail is (of course) redacted. How important Hs2 is to the delivery of Northern Powerhouse Rail is made clear in this observation.

“Elements of the HS2 design incorporate several NPR touchpoints. NPR could use c.80km of HS2 lines into Manchester and Leeds as part of its current designs. This represents more than 50% of the total new lines needed for NPR” (pge 38).

When Hs2 was first conceived, NPR didn’t even exist, so it’s hardly surprising that phase 2b is being reconsidered in the light of what’s now happening in the North. Yes, the delays can be considered frustrating, but the important thing is to get the two projects properly integrated and get it right.

There’s also some new points, such as this, which suggests HS2 are looking at the possibility of reducing the number of platforms they need at Euston. Notice reduce, not scrap going to Euston!

“The project teams are also considering whether reducing the project’s physical footprint in certain locations is feasible, for example at Euston”. (pge 41).

There’s a lot to go at in the report, so this is just me picking out the highlights and a few snippets. What conclusions can we draw from the report? I’d suggest it gives those opposed to the project very little ammunition that they’ve not already fired at HS2. Yes, the timescale has changed. Yes, it will cost more in the light of changes and the famous Harold Macmillan quote about “events, dear boy, events”! One thing the report does is what I suggested in my comment piece in the latest copy of RAIL magazine. “If not Hs2, then what”? Because the report makes crystal clear the need for Hs2 which is something those opposed to it always try and ignore. Also, nothing has been suggested to be cut. Not Euston, nor the Leeds leg, both of which have been speculated upon at length.

The report spells out the headache for Boris Johnson. What could he cut? The answer is – nothing that makes sense.

Cut phase 1? Then you leave the West Coast Main Line with sclerosis. The project’s already ready to go so you cause a lot of pain across the construction sector and send entirely the wrong message about UK competitiveness and capability. Oh, and without pause 1 there’s no point in building phase 2 as there’s nowhere to run the trains to as the WCMLs full and Birmingham Curzon St is part of phase 1!

Scrap phase 2? Ah, but as the report points out, mode than half of NPR track is actually HS2! Reneging on very public commitments to the North would go down like a cup of cold sick! Nor would you be helping to rebalance the economy, so that’s not going to go down well either.

Cancel either of them and you can throw your international commitments to tackle climate change out of the window too!

Mind you, as I write this it seems the Tories have just lost their Parliamentary majority, so Johnson may have other things on his mind!

No doubt this report will set the tone of the Oakervee review of HS2. I expect it to be endorsed by the real players on that committee, who will be asking exactly the same question I have. I’ve no doubt Hs2’s detractors will try to make hay out of the report. It’s likely at least one well-known rail commentator will stick the word “damning” in front of the word report, but in truth it’s anything but. It’s an honest look at the difficulties and challenges of building such a major infrastructure project in the 21st century. Now let’s see what the Oakervee review comes up with…


Saturday bits and bobs.

31 Saturday Aug 2019

Posted by Paul Bigland in Abandoned railways, Railways, West Yorkshire

≈ 2 Comments

Tags

Abandoned railways, Railways, West Yorkshire

I’m having another rare day at home catching up on chores and a spot of picture editing, mostly of images that don’t fit the main gallery categories on my website and need a bit of research first. Some of these were taken earlier in the week around Mirfield in West Yorkshire. Like many people involved in railways I have a curiosity about the many lines that closed during my childhood or even before I was born. Yorkshire’s rich in such lines and Mirfield has quite a few remains. One I spotted was what’s left of the Spen valley line which lasted a little over 50 years, opening in 1900 and closing in November 1966 although it lost its passenger services as early as 1953. Built by the LNWR it ran from Heaton Lodge Junction through Heckmondwike and Cleckheaton to Farnley Junction and on into Leeds City station. You can find out more about it on this very good website, ‘Mirfield memories’. Here’s what I found.

The site of Battyeford station which was built straddling the Huddersfield Rd. This is the North side.
The view looking in the opposite direction to the first picture. Part of the viaduct remains as many of the arches are occupied by commercial premises.
The opposite end of the viaduct where the railway crossed the River Calder on a steel bridge. Behind me is the line from Huddersfield to Dewsbury which is still operational.
The Spen valley line came off to the left just on front of this Class 185 which is approaching Heaton Lodge Junction.

If you’re interested in abandoned or disused railways there’s a gallery dedicated to them on my Zenfolio website. You can find it by following this link.

I’d love to have more time to spend to explore West Yorkshire’s railway heritage, but there’s little time for that as most of my time’s taken up with the modern, growing railway rather than the remains of a contracting one. That said, Dawn and I are hoping to get out on the bikes to explore several that are close to us which have been converted into some excellent cycle-paths. I first got to know about several of them when I explored them by bike for an article in RAIL magazine. One of their writers and I were given a guided tour on Brompton bikes by a couple of Sustrans officers and I’ve always meant to revisit the places and infrastructure we saw. Some of the viaducts, tunnels and cuttings were really impressive, especially around Heckmondwike, Dewsbury and Queensbury. But as the year is rapidly moving on, that may have to wait until next year!

← Older posts
Newer posts →

Recent Posts

  • 20th October picture of the day…
  • 18th October picture of the day…
  • 13th October picture of the day…
  • 12th October picture of the day…
  • 11th October picture of the day…

Recent Comments

Paul Bigland's avatarPaul Bigland on 20th October picture of the…
Ian Dinmore's avatarIan Dinmore on 20th October picture of the…
RNP's avatarRNP on The grand tour. Day 9. Riga (L…
Steve's avatarSteve on Rolling blog. The OLE challeng…
Gerry's avatarGerry on Rolling blog. The OLE challeng…

Archives

  • October 2026
  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • June 2013

Categories

  • 'Green' madness
  • 'Think Tanks'
  • 144e
  • 2005 London bombing
  • 2017 General election
  • 3 peaks by rail
  • 3 Peaks by ral
  • 51M
  • 7/7
  • Abandoned railways
  • Abu Dhabi
  • ACoRP
  • Adam Smith Institute
  • Adrian Quine
  • Advertising
  • Air Travel
  • Aircraft
  • Airports
  • Airshows
  • Allan Cook
  • Alstom
  • Amsterdam
  • Andrea Leadsom MP
  • Andrew Gilligan
  • Andrew Haylen
  • Andy Burnham MP
  • Anti Hs2 mob
  • AONBs
  • Arambol
  • Architecture
  • Art
  • Australia
  • Avanti West Coast
  • Bali
  • Bangkok
  • Bank holidays
  • Barrow Hill
  • beer
  • Belgium
  • Bereavement
  • Berlin
  • Bigotry
  • Birmingham
  • Blackpool
  • Blists Hill
  • Blue passports
  • Boris Johnson MP
  • Bradford
  • Brazil
  • Brexit
  • Brighouse
  • Brighton
  • British Railways
  • British Railways (BR)
  • Buckinghamshire
  • Buses
  • Byline media
  • Calder Valley
  • Calderdale
  • Cambridge
  • Cambridgeshire
  • Canals
  • Cardiff
  • Carillion
  • Carolyne Culver
  • Censorship
  • Charities
  • Cheryl Gillan MP
  • Cheshire
  • Chester
  • China
  • Chris Packham
  • Claire Perry MP
  • Class 08
  • Class 155
  • Class 180
  • Class 313
  • Class 314s
  • Class 317
  • Class 319
  • Class 320
  • Class 321
  • Class 323
  • Class 345
  • Class 365
  • Class 455
  • Class 456
  • Class 507
  • Class 508
  • Class 60s
  • Class 91
  • Climate Change
  • Communications
  • Community
  • Community rail
  • Community Rail Network
  • COP26
  • Corbynwatch
  • Coronavirus
  • Coventry
  • Covid 19
  • CP5
  • Crap journalism
  • Crazy anti Hs2 campaigner of the week
  • Crazy kippers
  • Crewe Hub
  • Crossrail
  • Cuba
  • Cumbria
  • Customs
  • Cyberattacks
  • Cycle India
  • Cycling
  • Dame Bernadette Kelly
  • Dawn
  • Democracy
  • Denmark
  • Derbyshire
  • Desiro City
  • Devon
  • Dewsbury
  • Diary
  • Dispatches
  • Doha
  • Donald Trump
  • Doomed
  • Dorset
  • Down memory lane
  • Dresden
  • Duxford
  • East Lancashire Railway
  • East Midlands Railway franchise
  • East Midlands Trains
  • East-West rail
  • Easter fairy stories
  • ECML
  • Economic illiteracy
  • Economics
  • election2015
  • Elon Musk
  • Engineering
  • Environment
  • Essex
  • Estonia
  • europe
  • Eurostar
  • Euston
  • Extinction Rebellion
  • Fake News
  • Festivals
  • Film and TV
  • Flag shaggers
  • Flooding
  • Flora and Fauna
  • Food
  • Food and drink
  • Foot in mouth
  • France
  • Gardening
  • GBRf
  • GCRE
  • General election
  • General election 2019
  • General election 2024
  • Georgetown
  • Germany
  • Glasgow
  • Glossop
  • GNGE
  • GNRP
  • Goa
  • Goole
  • Grand Central trains
  • Grant Shapps MP
  • Great Western Railway
  • Greater Anglia franchise
  • Greater Manchester
  • Greece
  • Green issues
  • Green madness
  • Green Party
  • Grok
  • Gt Missenden
  • GTR
  • Guido Fawkes
  • GWML
  • GWR franchise
  • Gwyll Jones
  • Halifax
  • Hampshire
  • Harvil Rd Hs2 protest
  • Harz railway
  • Heathrow 3rd runway
  • High Speed 1
  • High Speed UK
  • History
  • Hitachi
  • Hong Kong
  • House of Lords
  • HS North
  • Hs1
  • Hs2
  • Hs2 Bow Group
  • Hs2 petitions
  • Hs2 Phase 2B
  • Hs2 to Crewe
  • Hs2aa
  • HS2Rebellion
  • HSUK
  • Huddersfield
  • Humberside
  • Humour
  • Hurricane Ophelia
  • Huw Merriman MP
  • Hypocrisy
  • I love my job
  • Imperial College London
  • Imperial War Museum
  • India
  • Indonesia
  • Infrarail
  • Innotrans
  • Internet
  • Iolo Williams
  • iran
  • Ireland
  • Islamophobia
  • Istanbul
  • Italy
  • Jacob Rees Mogg
  • jakarta
  • Jeremy Corbyn
  • Jeremy Corbyn MP
  • Jo Johnson MP
  • Joanne Crompton
  • Joe Rukin
  • John McDonnell MP
  • John Poyntz
  • Johnathan Bartley
  • Journalism
  • Kanchanaburi
  • Kemi Badenoch
  • Kent
  • Kuala Lumpur
  • Labour election
  • Lancashire
  • Laos
  • latvia
  • Law and order
  • Lazy journalism
  • Leicestershire
  • Levelling up
  • Liam Halligan
  • libel
  • Lilian Greenwood MP
  • Lincolnshire
  • Lithuania
  • Liverpool
  • LNER
  • Local elections
  • Local elections 2018
  • Lockdown
  • London
  • London Underground
  • Lord Berkeley
  • LRT
  • M62 motorway
  • Major Projects Authority
  • Malaysia
  • Manchester
  • Manchester Airport
  • Manchester Victoria
  • MAPA
  • Mark Keir
  • Marketing
  • Martin Tett
  • Mediawatch
  • Melton Mowbray
  • Memory Lane
  • Merseyrail
  • Merseyside
  • Michael Dugher MP
  • Michael Fabricant MP
  • Mid Cheshire against Hs2
  • Miscellany
  • Modern Railways
  • Monorails
  • Music
  • Musings
  • Mytholmroyd
  • Natalie Bennett
  • National Rail Awards
  • National Trust
  • Nepal
  • Network Rail
  • Never a dull life
  • New Economics Foundation
  • New trains
  • New Year
  • New York
  • New Zealand
  • Newcastle
  • NHS
  • Nigel Farage
  • Norfolk
  • Norland scarecrow festival
  • North Yorkshire
  • Northern Powerhouse
  • Northern Rail
  • Northumberland
  • Norway
  • Nostalgia
  • Nottingham
  • Obituaries
  • Old Oak Common
  • ORR
  • Ossett
  • Our cat, Jet
  • Oxfordshire
  • Pacers
  • Paris terror attack
  • Parliament
  • Pasenger Growth
  • Patrick McLouglin MP
  • Penny Gaines
  • Peter Jones
  • Peterborough
  • Photography
  • Photojournalism
  • Picture of the day
  • Poetry
  • poland
  • Politics
  • Porterbrook
  • Portugal
  • PR nightmares
  • Preston
  • Protest
  • Public Accounts Ctte
  • Pubs
  • rail ale
  • Rail electrification
  • Rail fares
  • Rail Investment
  • Rail Live 2021
  • Rail Live 2022
  • Rail Live 2024
  • RAIL magazine
  • Rail Moderinsation
  • Rail PR
  • Railfreight
  • Railstaff awards
  • Railtex
  • Railway Benefit Fund (RBF)
  • Railway Engineering Institute
  • Railway preservation
  • Railways
  • Rant
  • Religion
  • Reservoir blogs
  • RFEM
  • Richard Wellings
  • Ride India
  • Rishi Sunak
  • Road accidents
  • Rolling blogs
  • ROSCOs
  • Royal Mail
  • Royal Wedding 2018
  • RSPB
  • Rugby Observer
  • Rushbearing
  • SAIP
  • Sarah Green
  • Scores on the doors
  • Scotland
  • Scotrail
  • Sheffield
  • Ships
  • Shrewsbury
  • Shropshire
  • Siemens
  • Signalling
  • Silly season
  • Simon Heffer
  • Simon Jenkins
  • Singapore
  • Sleeper trains
  • Snail mail
  • Social media
  • South West Trains
  • Southport
  • Sowerby Bridge
  • Spectator magazine
  • Sri Lanka
  • St Pancras station
  • Stafford
  • Stamford
  • Station buffets
  • StopHs2
  • Surabaya
  • Surrey
  • Swansea
  • sweden
  • Switzerland
  • Talgo
  • Teresa May
  • Terrorism
  • Tesla
  • Thailand
  • Thameslink
  • The 'Beast from the East'
  • The BBC
  • The Big 6
  • The Cludders
  • The Daily Express
  • The Economy
  • The end of the line
  • The fog
  • The Grand Tour
  • The Grauniad
  • The Great Central railway
  • The Green Party
  • The Guardian
  • The Independent
  • The Labour Party
  • The Moorcock Inn
  • The Netherlands
  • The Piece Hall
  • The PWI
  • The Railway Children
  • The Rodelblitz
  • The USA
  • The Woodland Trust
  • Tilford
  • Tony Allen
  • Torquay
  • Tourism
  • TPE
  • Traffic congestion
  • Trams
  • Trans-Pennine electrification
  • Trans-Pennine Route Upgrade
  • Transport
  • Transport Committee
  • Transport for Wales (TfW)
  • Travel
  • TRU
  • Turkey
  • Twilight years
  • Twitter
  • Twitter (and how not to use it)
  • UK
  • UK steel industry
  • UKIP
  • ukraine
  • Uncategorized
  • Uxbridge
  • Vandalism
  • Victoria Prentis MP
  • Virgin Trains
  • Virgin West Coast
  • Vivarail
  • Wales
  • Walking
  • Warwickshire
  • WCML
  • Weather
  • West Yorkshire
  • Wigan
  • Wildlife Trusts
  • Wiltshire
  • Worcester
  • Work
  • World car-free day
  • World War 1
  • World War Two
  • Yorkshire
  • YorkshireStopHs2

Meta

  • Create account
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.com

Blog at WordPress.com.

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Subscribe Subscribed
    Paul Bigland
    Join 478 other subscribers

    Have a WordPress.com account? Log in now.

  • Paul Bigland
    View site in Reader
    Manage subscriptionsSign upLog in
    Report this content
    Collapse this bar
Loading Comments...