It’s a short blog from me tonight as I’m on nursing duty as Dee was truck down by a bad migraine this afternoon.
Today’s been another day of two halves. The morning was spent working from home, wading through yesterday’s picture haul whilst keeping on top of paperwork and household chores. The weather wasn’t brilliant and the temperature distinctly nippy, so much so I wasn’t sure I that was wasting my time when I pegged out a line full of washing. Despite the lack of sunshine I decided to nip out for a few hours to check on the Trans-Pennine route upgrade (TRU) work East of Huddersfield. Dawn was meant to be having an evening out with friends so I thought I’d get out too.
Luckily, by the time I got the train from Sowerby Bridge to Dewsbury the weather had changed and I was treated to some glorious sunshine, even if temperatures were still on the chilly side. I’m going to write about the TRU work in a separate blog as it deserves its own. I saw a lot of changes at the places I visited, some substantial. Here’s a couple of pictures to whet your appetite.
The new station at Morley begins to take shape. It’s being built a very short distance away from the original station which is just out of sight to the right. This view’s looking East.A TPE service races through Cottingley station. Opened in 1988 it’s being replaced by the new £26.5m ‘White Rose’ station built further West and will close as a consequence, probably at the timetable change in December 2023 if the new station’s ready in time. It wasn’t just new railways I looked at as I also stopped off to have a wander around Dewsbury, a town that used to have far more railways than the one it does now. Here’s the (sadly closed) Station hotel in the town centre. To the right was the site of the GNRs Dewsbury Central station which closed in 1964. The course of the railway is now part of the A638 ring road, hence the new bridge behind the hotel.Dewsbury still possesses some very grand buildings that reflect the towns Victorian wealth. Here’s the Town Hall. This Grade 2 listed building opened in 1889.
My day was cut short when Dee texted me to say she was unwell, but I’ve plenty of pictures to add to a blog tomorrow, and all taken in great weather too!
I’ve a small favour to ask… If you enjoy reading this or any of the other blogs I’ve written, please click on an advert or two. You don’t have to buy anything you don’t want to of course – although if you did find something that tickled your fancy that would be fab! – but the revenue from them helps me to cover some of the cost of maintaining this site (which isn’t cheap and comes out of my own pocket). Remember, 99% of the pictures used in my blogs can be purchased as prints from my other website – https://paulbigland.zenfolio.com/ Or – you can now buy me a coffee! https://ko-fi.com/paulbigland68312 Thank you!
Walking to Halifax station was enjoyable this morning. No rain for a change, even if the Calder valley was shrouded in mist.
Traffic was light too though dog-walkers were out in force. Having left the house at 06:50 I had time to spare to catch the 07:39. I ended up walking straight on to the 07:20 which was running 7 mins late due to a fault on one of the two Class 195/0s forming this four car train.
This service calls at Low Moor, the new (ish) intermediate station between Halifax and Bradford. I’m rarely on services that call here so I was impressed to see dozens of folk waiting to join us.
After a rapid exchange of passengers at Bradford Interchange and with enough time for the crew to swap ends we’re now on our way to Leeds. Looking around I’d say this car is 50-60% full. I’ve no doubt that’ll increase on our way into Leeds.
0755.
Sure enough, our call at New Pudsey resulted in one departing passenger replaced by seven joining – and that was just in my car. Passengers on this train are a mix of commuters and holiday-makers. I’m sharing a table with a couple in their mid 30s in high-vis cycling jackets and a young lad whom I’m assuming’s on his way to work.
08:45.
Being ahead of schedule has allowed me to get ahead of myself and take the scenic route. I had 6 minutes in Leeds to make a dash for LNER’s 08:15 to Kings Cross which I’m taking as far as Doncaster. Yes, Doncaster. OK, I lied about the ‘scenic’ bit! My trains formed of a 9-car Azuma and the loadings are healthy. Here’s coach H.
09:05.
My visit to Doncaster was brief. I had long enough to grab a couple of pictures and admire the varied collection of stock outside the Wabtec works (an AET ”Networker’ and Chiltern’s 165004 plus sundry Mk3 coaches) before it was time to jog over to platform 0, which I’ve never used before. I’m now on Northern’s 09:05 to Goole which is being worked by a 2-car class 158.
11:40.
S’cuse the gap. As soon as I arrived at RaiseE I was thrown into a round of introductions or discussions with old friends. Sadly, many of the conversations were pessimistic. Wether it’s Brexit or the shambles that’s government policy and rail finances (not to mention internal problems of some major players) the picture’s not a happy one.
However, the event focussed on the positive aspects and opportunities for the future. More of that later..
Harry Hill from Enable Ltd and Lucy Prior from Trough-Tec Systems Ltd with a joint presentation on collaborating with the supply chain to create a greener rail industry.
17:35.
The conference finished after lunch and after saying some goodbyes I left to make the most of the glorious sunshine. I realised I’d never really taken pictures around this way and that my ladt visit was in 2010 so I decided to make amends. The rail network’s a shadow of its former self as the dock lines are disused and the new Siemens factory – whilst rail connected – isn’t generating any traffic.
However, the docks are still used by shipping and the distinctive ‘salt and pepper’ buildings dominate the skyline nearby.
There’s also this rather interesting building that looks remarkably similar in style to certain London Underground stations. I’m guessing they were designed by the same architect.
Having spent an hour exploring I took a trip to the end of the line at Hull to add a few more library pictures. I’m glad I did. The classic view of the station throat is rapidly being closed off by tree growth.
22:00.
I’m now back at home after retracing my steps from Hull to Goole, back to Doncaster and thence on to Leeds and Bradford before arriving back in Halifax. The weather’s been glorious and the travel really interesting. I’ll flesh out more of this blog shortly but for now here’s a couple more pictures from my travels.
158853 works a Hull – Doncaster service past ‘salt and pepper’ the two water towers that dominate the Goole skyline. Hull has become a good place to find the seven members of Class 155. Built by British Leyland in 1988 for Calder valley services they’re rarely seen on their former home turf although they do put in appearances on the Hull – Halifax shuttles. Goole signalbox. It was built in 1909 by the North-Eastern railway to their standard ‘S4’ design. Over the years its lost the external wooden walkways with metal handrails that allowed access to clean the windows. The locking-room windows have also been bricked up which was probably done during World War 2 to add protection from bomb damage.
I’ve a small favour to ask… If you enjoy reading this or any of the other blogs I’ve written, please click on an advert or two. You don’t have to buy anything you don’t want to of course – although if you did find something that tickled your fancy that would be fab! – but the revenue from them helps me to cover some of the cost of maintaining this site (which isn’t cheap and comes out of my own pocket). Remember, 99% of the pictures used in my blogs can be purchased as prints from my other website – https://paulbigland.zenfolio.com/
Today’s been one of unexpected variety and visits to places I’d no idea that I’d end up in. Because of that it’s now late, too late to write a blog that does the day and the places we visited justice – so this is going to be a very short blog indeed. I’ll explain more in detail tomorrow.
Our impromptu afternoon meant that we ended up having lunch in the Robin Hood Inn at Pecket Well high up in the hills on the road between Hebden Bridge and Oxenhope. This is a lovely pub in a great location and the food is well worth calling in for. Dawn had the fish and chips whilst I enjoyed a huge Yorkshire pudding stuffed with beef and gravy, served with chips and vegetables which I struggled to finish. At £12.50 one can hardly complain about the price. Feel hungry yet?
Dawn’s was a small portion! The exterior of the Robin Hood. They have a beer garden to the right which has some great views across the Calder Valley.
I’ve a small favour to ask… If you enjoy reading this or any of the other blogs I’ve written, please click on an advert or two. You don’t have to buy anything you don’t want to of course – although if you did find something that tickled your fancy that would be fab! – but the revenue from them helps me to cover some of the cost of maintaining this site (which isn’t cheap and comes out of my own pocket). Remember, 99% of the pictures used in my blogs can be purchased as prints from my other website – https://paulbigland.zenfolio.com/
There’s not much of a blog from me today. Not that there’s nothing to say, rather that there’s too much and I’m not in the mood for polemics. Much of my day has been spent catching up on bits of work and planning my diary, a task made slightly harder when a a press lunch invite is sent out (so entered into the diary) only for it to be cancelled without reason just a few hours later. Ho hum!
My morning was spent glued to my desk, which wasn’t much of a hardship as the weather here in the Pennines has been pretty miserable with lots of cloud, temperatures way short of double-figures and buckets of rain. I did venture out this afternoon as I needed to drop a parcel off at the Post Office in Sowerby Bridge and pick up a few bits of shopping, but it wasn’t much fun walking back along the canal as the rain decided to follow me. Even the dog walkers I passed looked like they’d rather be somewhere else. I know the feeling!
This evening the rain appears to have stopped, but only because the winds sprung up. The forecast suggests we’re in for another wet and blustery day tomorrow so it looks like another day working from home is the best plan. No matter, I’ve got plenty to be getting on with…
With the weather being so miserable I’ve opted for a more colourful picture today so here’s one from the archives. I didn’t really make it to a beach on my recent Asia travels, unless you count stopping off to admire one whilst waiting for a bus on Penang Island. In retrospect I wish I’d had some beach time, but it wasn’t to be. Here’s a beach I used to frequent on a regular basis but I haven’t been back for 20 years now and I doubt it looks this empty anymore. This is the long beach at Arambol, North Goa, India seen on the 31st January 2000.
I’ve a small favour to ask… If you enjoy reading this or any of the other blogs I’ve written, please click on an advert or two. You don’t have to buy anything you don’t want to of course – although if you did find something that tickled your fancy that would be fab! – but the revenue from them helps me to cover some of the cost of maintaining this site (which isn’t cheap and comes out of my own pocket). Remember, 99% of the pictures used in my blogs can be purchased as prints from my other website – https://paulbigland.zenfolio.com/
On Friday I paid a visit to Stalybridge station to see the result of the engineering blockade that had transformed the stations Western junction. This is been totally remodelled and resignalled. The resignalling has extended to the Eastern side of the station although the track layout here remains unchanged. As well as track and signals a large number of overhead electrification masts and portals have appeared, although there’s still many more to be installed at further weekend engineering possessions before the wires can be extended.
Here’s a selection of pictures showing how the place looks now.
Looking West to Stalybridge Junction from the end of platform 3. This junction was remodelled as recently as 2011. This time some of the switches have been removed and replaced with a flat crossing (just out of sight around the curve). The formations been expanded by the removal of the old ATO oil siding in the far left, which has allowed tracks to be slewed. The remodelling appears to remove conflicts and certainly allows for faster line speeds across the junction. Bi-mode 769424 pulls into the bay platform 5 with a Southport-Stalybridge service. 185151 approaches platform 3 working 2E73, the 1158 Manchester Piccadilly to Huddersfield.185151 sits waiting time in platform 3. The newly installed portals are very much in evidence. 802208 approaches from the East whilst working 9M10, the 1006 Newcastle to Liverpool Lime Street. The new portals have usurped the signal gantry that was installed (at great expense) at this location in 2012. And there it was – gone! The substantial signal gantry that was installed as part of the original Trans-Pennine electrification scheme but (apparently) was now in the way of the revised scheme for some reason. It’s no wonder many rail improvements cost so much money when plans constantly change and investment like this is wasted. It’s seen here in 2016.New signalling and OLE masts that have been installed at the East end of the station between platforms 3 and 4.Looking East along platforms 5 and 4 with new masts and portals in place where the former through tracks were situated. Looking along the railway viaducts by Waterloo Road. The bracket where the 2012 signal gantry was fixed to the side of the piers remains. 185107 calls at platform 4 outside the famous buffet bar whilst working 1K23, the 1354 Liverpool Lime Street to Hull.
I’ve a small favour to ask… If you enjoy reading this or any of the other blogs I’ve written, please click on an advert or two. You don’t have to buy anything you don’t want to of course – although if you did find something that tickled your fancy that would be fab! – but the revenue from them helps me to cover some of the cost of maintaining this site (which isn’t cheap and comes out of my own pocket). Remember, 99% of the pictures used in my blogs can be purchased as prints from my other website – https://paulbigland.zenfolio.com/
Only a short blog from me today, but I hope you enjoy it. Today was another one of those that didn’t quite go to plan as I was busy slaving away in the office this morning then thought ‘bugger it, this weather is too good to waste’ so I packed my kit and headed over to Manchester via the Calder Valley to catch some of the last Stalybridge blockade diverts and also visit Stalybridge itself – which was a bit of a time-consuming faff on rail replacement buses. On the bright side I got to see parts of Manchester I’ve never seen before – and some that I never want to see again!
I’ll write more about this at a later date. But the most surreal part of the trip was when I stopped off at Todmorden on the return. As I wandered along the Leeds bound platform I heard a quacking noise from the other side of the platform fence. When I looked I realised I was being accosted by two ducks. Said ducks then stuck to me like glue all the way along to the end of the platform. They wouldn’t leave me alone and even started pecking at my boots through the fence. I get the impression that some kind soul has been feeding them and now any passenger is seen as a meal ticket! In all my time travelling the railways I’ve never seen anything like it! So, here’s a short video of my two feathered assailants…
If you ever go to Tod’ – take food!
I’ve a small favour to ask… If you enjoy reading this or any of the other blogs I’ve written, please click on an advert or two. You don’t have to buy anything you don’t want to of course – although if you did find something that tickled your fancy that would be fab! – but the revenue from them helps me to cover some of the cost of maintaining this site (which isn’t cheap and comes out of my own pocket). Remember, 99% of the pictures used in my blogs can be purchased as prints from my other website – https://paulbigland.zenfolio.com/
Hooray! The rain’s stopped here in the Chilterns. Instead (according to the forecast) we’re in for a day full of dull cloud and no sunshine. Looking out of the skylight in my room in the pub we stayed in last night that certainly seems to be the case. Even so, there’s plenty of HS2 sites to see in the area and as we travel Northwards so I’ll post a few pictures through the day as we visit places. But first, it’s time for breakfast then to find somewhere to charge up Penny’s electric car. Charging EVs is a logistical exercise in itself and adds a whole new dimension to travel planning.
As well as HS2 construction sites one thing we’ll be looking at is the ecological work and mitigation planting. If you believed the scaremongering nonsense the opponents of HS2 put out tree planting either doesn’t happen or the ones planted are all dead. Nothing could be further from the truth. Here’s a (large) site on the South edge of the West Hyde construction site that we visited yesterday. Do these look imaginary or dead to you?
I’ve many more close-up shots of the impressive growth of this recently planted (2017) wood that I’ll add to my Zenfolio gallery on HS2 construction.
11:10.
Well, we’re not doing much exploring righ now but I am learning a lot about the pros and cons of electric cars! We’re currently in the car park at Morrisons in Aylesbury, waiting for the car to charge. There was no charging point at the pub, so we couldn’t charge the car overnight so we only had 30 miles left on the battery. Not enough to get anywhere. The nearest chargers were in Aylesbury. Then it’s a question of finding a fast (50kw) charger and pray no-one else is using it. So, you spend a lot of time faffing around because the last thing you want to do is run out of juice in the middle of nowhere. You can’t exactly walk with a Jerry can to the nearest garage for a bucket of electricity! Penny’s car is currently charging at 1 mile oer minute. There’s another complication. This charger has 3 charger cables. Only two are compatible with the car and one of them (the fastest) is knackered. It’s a common problem apparently. So, if you don’t want to suffer ‘power anxiety’ – buy a hybrid. This car (a Renault Zoe) has a real maximum range of +/- 200 miles so 100 miles range out and back before you need to think about finding a charging station. Oh, and that’s without driving too fast or using stuff like heaters etc..
Time to sit and compose a few emails and blog whilst watching the miles build up.
19:30.
Another day that didn’t quite go to plan but was still an excellent one anyway. Well, until I ended up on a train full of pissed-up Stoke City fans on their way back from Coventry (but more of that later).
Having charged up the car enough to do what we wanted to do (with a margin of error) we headed back to the infamous Jones’ Hill wood, scene of some of the most dishonest anti HS2 protests. I’ve blogged before about the lie that the wood had anything to do with Roald Dahl. This area (between Wendover and Great Missenden) is ‘nimby central’, not that any of their scaremongering achieved anything but it’s very interesting to compare the reality with the hype.
Whilst a Western edge of Jones’ Hill woods has been sliced off to make way for HS2 there’s a huge amount of new tree planting to the East which is doing really well. This will link the isolated Jones’ Hill with nearby woods to create a much larger wildlife habitat.
One of two ponds on the new mitigation planting site at Jones’ Hill woods with the wood in the background and new planting in the foreground. Behind me is another wood which the planting will link to Jones’ Hill. The HS2 trace is below Jones’ hill to the left .The Southern edge of Jones’ hill wood. Part of the wood had to be taken to build HS2. This picture was taken from the middle of the haul road. A footpath crosses the road and security staff let you across when it’s safe to do so. Looking North from Bowood Lane along the route of HS2 towards Wendover. So much for the ‘outstanding natural beauty’ of the Chilterns! To the left is the noisy A413 whilst the row of ugly pylons stretches the length of the valley. In contrast, when HS2’s completed most of it will be hidden from view.
Ironically, the ‘eco-warriors’ who were supposedly ‘protecting’ Jones’ hill woods have left their abandoned camp cluttering the woods.
Moving on from Jones’ Hill we headed back to Wendover to look at HS2 construction work nearby. Quite how HS2 was meant to cause so much disturbance to the village when it’ll pass in a green tunnel with the incredibly noisy A413 and Chiltern railway in-between has always been one of life’s mysteries. At the moment work isn’t as advanced as on other parts of the route so it’s hard to make out the trace of HS2, although this will change over the course of 2023. Funny, the local Nimbys have never complained about the unsightly line of high-voltage pylons that parallel the HS2 route in these parts!
Odd how those who tell us the Chilterns AONB is pristine and stunning fail to mention this row of plyons that dominate the valley between Gt Missenden and Wendover – or mention the persistent traffic noise from the A413! Here’s the view from above Wendover (off to the left) looking South towards Great Missenden. The trace of HS2 is starting to take shape. It will pass between the two nearest pylons, having crossed over the A413 and Chiltern railway at the bottom of the valley here.
Another place we visited was the small Wendover memorial wood for people who passed away at a local hospice. You may remember HS2 antis and media opportunists exploited this place in a disgraceful attempt to smear HS2 for desecrating a “childrens memorial” when it was nothing of the sort.
To be honest, it’s a sad, neglected place that looks pretty much abandoned. The memorial trees are too densely planted and look awful as no-one ever looked after them once they were planted, which is why many have their protective sheath still wrapped around them long after they matured. The place is unkempt, overgrown and covered with litter and other detritus. There’s little sign of the work HS2 carried out there, other than what likes a narrow path through some of the trees. The place doesn’t look like many people visit.
Moving on we bypassed Aylesbury and headed towards Quainton, stopping en-route to admire another mitigation site where (on first glance) tree- planting appeared to be less successful than other sites. On closer examination this proved to be untrue as many trees had been replanted, they simply hadn’t stuck their heads above their protective tubes yet! The trace of HS2 was very evident at this point.
North of Quainton we crossed the former route of the Great Central railway which (until recently) carried waste trains and HS2 construction trains as far as Calvert. Now the sites been transformed into a construction site as the old road bridge is being replaced and the road diverted (pics later).
The view from Whitehills bridge looking towards Quainton. The Calvert binliners and HS2 materials trains used this part of the old Great Central until recently. In the foreground excavations have begun for the piles for the replacement for the bridge I’m standing on. Whitehills bridge looking North towards Calvert.
Our final visit was to Calvert itself. The place has changed a lot since my last visit with the E-W rail line embankments taking shape either side of the HS2 overbridge. Several other E-W bridges are being replaced as part of the same contract whilst roads are being diverted and the site of the HS2 Infrastructure Maintenance Depot (IMD) is being laid out. Whilst we were here we were blessed with some lovely low sunlight whic made a real change from the dull day we’d had up to that point.
The site of the old Calvert station looking South. HS2 tracks will occupy this site in a few years time. Looking North from the same bridge. This site was a major railhead for bringing HS2 construction material in by rail. The new E-W rail overbridge at Calvert under very moody skies.The site of the Calvert HS2 Infrastructure Maintenance depot is beginning to be laid out. To the right is the route of E-W rail whilst the new bridge in the background is the remodelled Addison Rd.
Both of us would’ve loved to have lingered longer but when I checked train times back home we realised we’d need to make a dash for Banbury in time for me to make a sensible connection. This got a bit fraught when we got into Banbury as their was traffic chaos because the police had the main road towards the station blocked off. Instead Penny drove back to Leamington where I made my train by the skin of my teeth – but only because it was running five minutes late.
I was breathing a sigh of relief and considering staying on this Cross-County service all the way to Manchester until we pulled into Coventry where my coach was invaded by Stoke City fans. Their behaviour was appalling. They kept up a stream of foul-mouthed, misogynistic and borderline racist chants all the way to New St, at which point I’d had enough of too much testosterone and too few brain cells (as had many others in the coach). I baled and caught my original connection, the 19:03 Cross-Country service direct to Leeds. This is much quieter and far more pleasant – and neither sight nor sound of a football bore.
I’ve a small favour to ask… If you enjoy reading this or any of the other blogs I’ve written, please click on an advert or two. You don’t have to buy anything you don’t want to of course – although if you did find something that tickled your fancy that would be fab! – but the revenue from them helps me to cover some of the cost of maintaining this site (which isn’t cheap and comes out of my own pocket). Remember, 99% of the pictures used in my blogs can be purchased as prints from my other website – https://paulbigland.zenfolio.com/
Another silly o’ clock start. I’ve been up for an hour getting ready to head South to meet up with my ‘partner in crime’ for a couple of days exploring HS2 railway construction and mitigation sites, but first I’ve got to get to Banbury. The weather’s looking bleak. The rain’s already started here in the Calder Valley so Dawn’s being a star and giving me a lift to the station so that I don’t get a soaking from the off! I’ll be blogging throughout the day, so feel free to keep popping back to see what I get up to…
07:30.
Thanks to Dee I arrived at Halifax station dry and in plenty of time. Having bid Dawn au revoir I caught the 07:14 Halifax-Hull, an earlier train than planned which gives me an extra 6 minutes in the bank. As it’s starting from Halifax it’s also far less crowded, despite being worked by a 2-car Class 158 today. No doubt that situation will change once we’ve reached Bradford and beyond.
Even so, I’ve bagged a table seat, plugged my phone into the USB socket to keep it charged and begun to catch up with the waking world.
Almost as soon as we left the cheerful Guard conducted a ticket check. With the train being quiet we swapped cheeky banter as I asked when the trolley service came round!
07:40.
As I predicted, the train filled up at Bradford Interchange. My bay and the opposite table are now full. There’s a young businessman of Indian extraction sat opposite whilst the rest of the seats have been taken by a mother and daughters – also of Asian extraction but further South and East. I haven’t heard them speak so I can’t tell where they hail from originally.
Now we’re heading towards Leeds on a miserable day weather-wise. The sky’s a monotone grey, producing the light drizzle that soon has you soaked as it has the ability to permeate almost any clothing.
08:25.
My time at Leeds was brief, just 15 minutes. I hardly had time to get the camera out but then there wasn’t much of interest to photograph on such a grey day. Making my way to platform 15 I waited for Cross-Country’s 08:11 to Bristol Temple Meads which arrived spot on time. Consisting of two four-car Class 220s the service was reasonably busy. The was plenty of custom for it at Leeds, although several were only going as far as our next stop at Wakefield Westgate where we exchanged them for more long-distance travellers. The cross-country network is all things to all people. Some use it for short hops as the timings are convenient whilst others appreciate its reach and use it for far longer journeys – students and senior travellers especially.
Cross-country may not be the biggest operator but it’s certainly the most far-reaching. Although the network’s been cut back from its height its tendrils radiate from Birmingham afar as Penzance and Aberdeen. What a shame the dept of transport have no idea what to do with it other than cut its train-fleet by forcibly retiring their high-speed train fleet with no plan for replacement. Their capacity is desperately needed in the summer, especially now passenger numbers have bounced back and the state of the economy’s forcing more people to holiday in the UK.
11:00.
My trip to Birmingham was uneventful, although it gave great views of the HS2 construction sites at Washwood Heath and Curzon St, where the pillars for the elevated station deck are springing up like mushrooms. I filmed this as we passed.
Building HS2’s Curzon St station.
Birmingham’s wet. Very wet, so I was glad to seek shelter on Chiltern Railways 10:55 from Moor St which will carry me to my rondezvous in Banbury.
In a sign of the times I popped into a shop in New St which sells baguettes. It was always a busy place. For years the filled baguettes cost 99p and made a cheap and tasty meal. Then, post Covid they increased to £1.20. Today they’re £2.20. It may have been the time of day but the shelves were full but the shop empty. I was the only customer.
20:15
Apologies for the gap in blogging but we’ve been busy. I’m about to get something to eat then I’ll come back and fill in the gaps. In the meantime, here’s a few pictures to tease..
We were here at the Chiltern tunnels South portal where one of the ‘porous portals’ is being constructed now the area is cleared and the TBMs are over half way to the North portal. This one is over the London-bound track. Progress on the Colne Valley viaduct is impressive. It’s really come on since my last visit. Here’s a view of the launching girder ‘Dominique’ seen from the Denham waterski club site. One of the thousands of precast bridge segments that have been made on site at West Hyde is moved along the completed bridge to the launching girder ‘Dominique’ where it will be lifted and then turned before being dropped into position. The segments are made on site then moved from the factory along an internal haul road and onto the viaduct.
23:25.
Right, time for bed. It’s been a busy day although the latter part was foiled by the weather when the skies opened and stayed open, making photography next to impossible. Even so, we reconnoitered a few more HS2 construction sites which will allow us to pop back tomorrow when the weather’s improved before moving on to look at others.
I’ve a small favour to ask… If you enjoy reading this or any of the other blogs I’ve written, please click on an advert or two. You don’t have to buy anything you don’t want to of course – although if you did find something that tickled your fancy that would be fab! – but the revenue from them helps me to cover some of the cost of maintaining this site (which isn’t cheap and comes out of my own pocket). Remember, 99% of the pictures used in my blogs can be purchased as prints from my other website – https://paulbigland.zenfolio.com/
Tempting as it was I decided not to do a rolling blog today because I had more than enough plates to keep spinning without adding another one to the mix. We had a convivial night with many of the Community Rail Network team as we were saying goodbye to Director of Support and Development (and Deputy Chief Executive) Brian Barnsley. Brian was one of the early members of the team from the days when the organisation consisted of a handful of people. After a fun ‘life of Brian’ presentation at the conference social a few of us adjourned to a local hostelry that served real ale – and where you didn’t have to pay hotel prices! Even so, we were good as Dawn and I had to be up by 7am because Dee was working on the conference reception desk with Community Rail Support Officer Daniel Wright. The pair of them made a great double-act, prompting humour and a relaxed atmosphere – just what you need to know that the conference you’re attending isn’t going to be stuffy! We were starting early as many delegates had a long way to travel home, so whilst I had time to tuck into the excellent hotel breakfast Dee was preparing for the delegate deluge. leaving me no option but to drop in a Red Cross parcel of a Danish pastry, croissant and coffee to provide that all important sugar-rush! The conference was a really good event. There was a great range of speakers and presentations to keep people engaged which meant I was kept busy with the camera and laptop as I was constantly feeding the CRN media team with images to use on Twitter and other social media. That said, I did get to listen to and learn from some of the presentations, as well as chat with old friends during the coffee-breaks. The event wrapped up by 16:00 when we bid our farewell to Nottingham with many of us heading North to Yorkshire via Northern’s 16:17 to Leeds. Now the pair of us are relaxing at home ready for another busy few days.
You can find some pictures and more details of the event on CRN’s twitter feed at @CommunityRail.
Now, what to choose for picture of the day? I’m tempted by some of the conference photos but decided against it. Instead, here’s a look at some of the lovely old buildings that make up much of Nottingham’s city centre. In places like this is always worth looking up, although in Nottingham this is made easier by the fact the town’s built over a range of hills!
Here’s the view looking down Queen St with the clock and dome of the Town hall in the background.
Tomorrow I’ll be based at home as I’ve a lot of pictures and paperwork to catch up with before my next escapade later in the week which will involve a popular (and regular) feature of this blog as a friend and I will be visiting several High Speed 2 construction and mitigation sites along the phase 1 route between London and Warwickshire, so expect plenty of words and pictures to come.
I’ve a small favour to ask… If you enjoy reading this or any of the other blogs I’ve written, please click on an advert or two. You don’t have to buy anything you don’t want to of course – although if you did find something that tickled your fancy that would be fab! – but the revenue from them helps me to cover some of the cost of maintaining this site (which isn’t cheap and comes out of my own pocket). Remember, 99% of the pictures used in my blogs can be purchased as prints from my other website – https://paulbigland.zenfolio.com/
We’re packed, all electronic devices charged and ready and about to head off to the station to begin our journey to Nottingham to prepare for the Community Rail Network conference. I’ll blog about the trip en-route so feel free to pop back later to see what we get up to…
11:00.
We’re on our way on a bright but bitterly cold day. We even had a snow flurry before we left. Right now we’re on Grand Central’s 10:40 train from Halifax to London which we’re using to get to Wakefield where we connect with Northern’s Leeds-Nottingham service. This GC class 180s busy and even more so after calling at Brighouse where a few dozen were waiting to join. The latest ORR statistics show that GC services have really bounced back from Covid. They’re currently at 103% of pre-Covid figures. Great news for an open-access operator.
The section of line between Ellend (where a new station’s due to open in 2025) and Brighouse has recently been opened up by a huge amount of lineside tree clearance which makes it feel less like a green tunnel.
11:45.
We had 10 minutes for a cross-platform interchange at Kirkgate, where a new building has appeared on the island platform 2-3. Built on behalf of Grand Central it’s a substantial 3 room structure that replaces the draughty and basic shelter that used to be there. There’s staff accommodation at one end, a seated waiting area in the middle and what looks like a potential retail outlet or small office at the other. Only it doesn’t appear to have any power sockets, just a fuse board, which is odd!
The new structure at Kirkgate.
Our Nottingham train arrived spot on time. Thankfully, it’s formed of a 2-car Class 195 so we can make the most of the power sockets and wifi as there’s other members of the CRN team aboard too.
14:15.
Having reached Nottingham and the venue in plenty of time I’ve a few hours to kill before I’m needed I’ve nipped out to make the most of the good weather and grab some new library shots whilst I’m here. East Midlands Railway have had many Class 170s cascaded to them from other operators to start replacing their old BR built fleets. Some have come from Anglia, via Transport for Wales, such as this example.
With Nottingham Eastcroft depot in the background 170271 works 1K67, the 13:43 from Newark Castle to Crewe. To the left is the former parcels depot. The building’s intact and used as a Virgin active health club.
16:40.
I’ve enjoyed a couple of hours exploring and getting pictures of railways, trams and the town. One thing that struck me is how many vacant shops there are now. Parts of the town centre are almost deserted. One street I walked along was 90% derelict. Here’s a couple of phone pics to be going on with. I’ll add camera shots later.
The old parcels depot which is now a fitness studio.There’s one mad Tory Chiltern Cllr who insists that reopening the Great Central is a viable alternative to building HS2 as most of the route is intact. Really? This was the Great Central through the centre of Nottingham. Nothing remains.