The skies are blue today so I’m making a bid for freedom from the office to head out hunting some of the new Northern trains that were introduced into public service from Monday. The Class 331 electrics have spread their wings from operating solely on the Leeds to Doncaster route. They’re now on diagrams between Leeds, Bradford and the Aire Valley services. They’re also out and about on the Blackpool North to Liverpool Lime St route, displacing more old diesel units to allow more Pacers to head to the scrapyard. I’ll update this blog throughout the day. Let’s see what happens and where I get to…
10:35.
I thought I was being clever by hitching a lift into Huddersfield with Dawn, but it’s all gone pear-shaped at the station. Track-circuit failures at both East and West mean hardly anything is running to time. Delays are averaging 15-20m. My next service to Leeds is 16m late, leaving me lots of time to admire Northern’s shiny new Class 195s which are stood idle in the sidings.
11:08.
My trip to Leeds was spent standing in a vestibule aboard a 3-car Class 185, so no change there then! The service was busy with holiday makers including a gaggle of middle-aged professional women who were already on the Prosecco, but they were very well behaved, so no bother to anyone. Once in the city I caught the first available train for the Aire valley, the 11:12 to Bradford Forster Square which is worked by a refurbished Class 333. In fact it’s the first of the class – 001!
11:30.
My first port of call was the new station at Kirkstall Forge, a brownfield site that’s rapidly redeveloped. As I stand here all I can hear is the clanking of catapillar tracks and the warning horns of earthmovers. A new 7-storey office block immediately outside the station’s already open for business.
12:18.
I’ve moved on a couple of times now, first tk Shipley, then down to Bradford Forster Square for a brief photographic stop before returning to Shipley, which is a rare beast on the UK rail network. It’s a station built in the middle of a triangle of railway lines that has platforms on each side of the triangle. Only one other exists, at Earlestown on Merseyside. There did used to be several others, including nearby Queensbury, but they’re long gone. Shipley still has 5 out of the original 6 platforms as well as an old Midkand Railway station building which contains a booking office and traincrew depot.
14:10.
After several stops heading West up the Aire valley I’ve pitched up in pretty Skipton for lunch.
Frustratingly, the only Class 331’s I’ve found are all here – laid up in the carriage sidings! On the bright side, I’ve git several decent library/client shots and recorded the imminent demise of the trains Northern will be surrendering – the BR built Class 321/322s, known affectionately as “dusty bins”.
Skipton still retains most of its classic Midland Railway platform canopies
They have an interesting history. The Class 321/9 fleet were bought by the local passenger transport Executive especially for Aire Valley and Leeds-Doncaster services. The 322/4s have had a peripatetic existence. Originally built for ‘Stansted Express’ services from Liverpool St in London, they were displaced and ended up in Scotland where they worked Edinburgh – North Berwick services. Displaced once again, they ended ul being transferred to Leeds Neville Hill depotto strengthen services in the Aire Valley.
15:02.
Having ‘acquired’ copies of the two diagrams Class 331s are meant to be operating it’s clear that there are a few issues. I’ve found one running at Skipton but that’s on a training run to Shipley, which is where I’m going to head for as almost everything passes through there!
16:37.
Despite my best efforts 331s in traffic proved elusive. Services were’t performing well today so it was very muuch the luck of the draw. However, my luck did hold at Keighley where I managed an interesting historical comparison which I’ll upload this evening. As it’s Friday I called it a day early and headed into Bradford. A sprint between the two stations meant I made the 16:30 from Interchange back to my starting point in Huddersfield. It’s worked by one of the Pacers formerly based up at Heaton in Newcastle, so I’ve a vintage ride home and chance to enjoy one of these old workhorses before it takes its final trip to the scrapyard.
There’s not much blogging from me today as I’ve been spending another day cooped up at home for most of it, trying to get catch up on DIY, chores and paperwork. Add to this the fact the weather here’s been ‘mixed’ and there’s been little opportunity for photography. Here’s the view across the Calder Valley and Sowerby Bridge earlier when I wandered out to do some shopping. The latest rain shower’s sweeping up the valley from the West.
I do love the view from here. It’s a cobbled hill just above our home. You’d recognise it if you’ve ever watched the opening episode of the TV series “Gentlemen Jack” which is based on the life of Ann Lister. Let’s face it you don’t often get views like this walking to and from the supermarket – or the local pub!
Hopefully tomorrow I’ll be out and about again. Let’s see what happens…
As the old Chinese curse goes, “May you live in interesting times” – and we certainly do. So far today the Scottish Court of Session has ruled that Johnson’s proroguing of Parliament was unlawful, Meanwhile, the government is refusing to publish details of communications between No 10 aides about Parliament’s suspension, despite MPs voting for their release.
Now remind me, what was the Brexiters slogan? Oh yes – “take back control”. I wonder how many of the mugs who fell for that now feel that they’re remotely in control, never mind Her Majesty’s Government! In the space of a few short weeks we’ve go gone from a Brexitshambles to an complete clusterfuck. Johnson’s proved how utterly incompetent he is and the whole edifice of Parliamentary democracy has crumbled and fallen. And all for what?
In other news I’ve been working from home today but I managed to brave the gales in order to nip out and get some shopping whilst traversing the scenic woodland route to the supermarket to get my exercise steps in. What I didn’t do (for once) was get any pictures, so this blog is presented to you in glorious black and white text. Sorry about that folks!
I’m hoping to renew normal service over the next few days as there’s lots of exciting trips and events lined up right now. Right now I’m busy juggling the work/life balance, so this is all you’ll hear from me tonight. Cheers folks!
Regular readers may know that I’ve a cynical streak when it comes to academics. Sadly, there’s a number of them who seem to think their undoubted expertise in specific fields makes them a sage on all things, including complex subjects they know absolutely nothing about – not that this stops them pontificating!
The latest to come to my attention was this load of unmitigated tosh from Professor Dieter Helm, who’s an economist and lecturer at the University of Oxford and also an advisor to the Government.
Sadly, the professor seems to think that his knowledge of economics means that he doesn’t need to do any proper research when it comes to writing about the railways and HS2. If he had, he would have been very quickly dissuaded from writing the nonsense he’s produced. He starts badly, then rapidly goes down hill from there!
Here’s his opening stance:
“What is the question or questions to which HS2 is supposed to be an answer?” Do go on? “When it comes to HS2, the search for a justifying rationale has gone through many episodes. Only one, the original idea, has some merit, but HS2 is no longer an answer to it.” Really? And that original idea was what, exactly? “The original idea, the good one, was to integrate the UK into a European increasingly interconnected high-speed network” Err, Professor, if you’d bothered to do the slightest bit of research you’d have known that’s complete cobblers. Helm is talking about the link between HS1 and HS2 that was dropped by the Higgins review back in 2014.
In fact, that was never “the original idea” at all. HS2 came about because the then Labour Government asked Network Rail to look into the need for new rail capacity. The study, “Meeting the capacity challenge: The case for new lines” was published in 2009. Here’s a link to it. But the idea wasn’t new even then. An earlier feasibility study by W.S. Atkins was commissioned by the Strategic Rail Authority in 2001.
the 2009 Network Rail study considered four corridors and came to the conclusion that the best value option and the one that addressed future capacity constraints was a new high-speed route from London to Scotland.
Note that there was no mention of a link between the new line and HS1. This came about later.
The Network Rail study was the basis for HS2. It was taken forward by the Labour Government under Lord Adonis who’d already set up HS2 Ltd. HS2 Ltd reported back at the end of December 2009 and the then Transport Secretary, Andrew Adonis, published the Government’s response in a Command Paper, ‘High Speed Rail’, in March 2010. It was only then that a possible HS1-HS2 link was suggested as an option. It was never the “original idea” at all. That year, Labour lost power and the new Government confirmed the HS1-HS2 link as a firm proposal, until it became obvious it was a non-starter.
So, Helm’s fallen at the first hurdle. Let’s have a look at some of his other claims. Having got the first one badly wrong he claims that
” First, it is not true that the existing lines could not be upgraded and carry more capacity. Railways are basically empty for almost all of the time, and the distance between and number of trains depends upon stations and signalling. Standing on a mainline station platform at say Didcot Parkway, staring at the empty lines, reflects the fact that for most of the time there are no trains”.
Where to start with this nonsense? No-one has claimed that existing lines can’t be upgraded. Clearly, Helm has no idea that we spent £9bn upgrading the West Coast Main Line just 12 years ago! The point is that upgrading the Victorian network is complex, expensive and disruptive and it adds very little extra capacity compared to building a new high-speed line!
The next one’s even more laughable! Railways are “basically empty for almost all the time” Are you serious? This is weapons-grade nonsense. As for standing On Didcot Parkway, what on earth is that meant to prove? The levels of ignorance of how railway capacity actually works here is stunning. It would be laughable from an ordinary member of the public, but this man’s an Oxford Professor!
OK, let’s have a look at those ’empty railways’ in the real world. Here’s a copy of today’s actual train workings from ‘real time trains’ for Roade, which is on the two track section of the West Coast Main line South of Rugby. This is the section that phase 1 of HS2 is designed to relieve. This is what passed between 07:00 and 08:00 this morning. A note for those unfamiliar with this, the times in the two right hand columns show first the working timetable times, then the actual time the train passed.
There were 31 trains out of 32 scheduled, as one was cancelled. There’s 16 trains heading for Euston alone, that’s roughly one every four minutes. Some “mostly empty” railway, eh? Right, let’s have a look at the next bit of nonsense.
“Few mainlines carry trains less than 10 to 15 minutes apart. Existing lines could be upgraded, and they have the great merit of already existing and require much less extra land and demolitions that the new line must have. For £100 billion, the existing rail network could be upgraded almost everywhere, with comprehensive modern signalling, station enhancements and a coherent fibre enabled communication system to run it“
Yet again the Prof falls flat on his face in the first sentence. How many other main lines do I need to provide real-time running information to expose this nonsense on stilts? Has the Prof any idea of how much of our railway network HAS already been upgraded over the past few years, or how the fact Network Rail’s spending record amounts doing more?
How does any of this remove the need for HS2? It doesn’t. For example rebuilding Reading at a cost of £1bn a few years ago has done nothing to add capacity to the WCML, only HS2 can do that. OK, let’s plough on.
“Far from dispersing growth to the north from the south, it could easily work the other way around. Furthermore, it is not obvious that the economic growth problem in the north is caused by lack of connection to London, or that the £100 billon spent on HS2 is the best way of increasing the northern growth rate”.
Here we see the usual obsession with London, ignoring all the other places HS2 connects. But let’s tackle this one head on as I’m a perfect example of why this is a fallacy. I live in West Yorkshire but I often work in London. Where do I spend the money I earn in London? Most of it in West Yorkshire, where I live, not where I work. When I get the morning Express to London and home in the evening there are hundreds of other Yorkshire folk doing exactly the same, only now it’s getting increasingly difficult to work on the trains as they’re full. If I get the Grand Central service from Halifax to Kings Cross I’ll be lucky to get a seat, even in First Class, making me less productive. This is the difference between economic theory and reality. Right, next..
“Promoting the economic growth prospects in the north is much more about connectivity within the north” The Prof seems blissfully unaware this is exactly what HS2 does. If we take “the North” as being out of the M25! The current rail services between Birmingham, Leeds and Manchester are slow and not fit for purpose. HS2 will cut journey times between B’ham and Manchester by 52% and B’ham and Leeds by 58%! It will make a huge difference in connectivity between those major cities – and many more.
“In transport, there are two main alternative options. The money could be spent on upgrading the existing rail network, with smart signalling and metering, and smart system coordination, better smarter stations, better access to stations, more and better stations, and better rail lines”.
Frankly, some of that doesn’t even make sense. What on earth is “smart signalling and metering“? If he’s referring to digital signalling like ATO, he’s clearly unaware of the limited capacity gains it offers on mixed traffic railways like the West Coast Main Line (the busiest in the EU). It’s estimated by signalling experts that digital signalling could offer around 15% extra capacity on mixed traffic lines. At the current rate of growth, that would be eaten up in just a few years. Then what? We’re back to square 1. In contrast, HS2 offers a massive capacity increase by moving non-stop express trains off the existing lines onto dedicated lines where digital signalling really can help because all trains are running at the same speeds. It also frees up lots of capacity on our existing network. Not just on the WCML but also on the East Coast and Midland main lines.
” If autonomous electric vehicles develop, controlled by smart systems, and powered by low carbon electricity generation, then roads may be better than rail in the future, having greater flexibility and able to take denser traffic.”
“If”? We need solutions now, not play wait and see! As it is autonomous vehicles have been overhyped and underachieved. I may not see eye to eye with the commentator Christian Wolmar on HS2, but he’s done some excellent work debunking the hype around driverless cars. Even “if” they did arrive there’s no way we’d be seeing what the Professor is suggesting as every vehicle on the road would need to be autonomous before you’d see this pipe-dream happen. But just say it did. Electric vehicles are still far more polluting than trains. Oh, and how an electric car carrying a max of 5 people and limited to 70mph will be ‘better’ than a 200mph train carrying 1100 is stretching reality to breaking point. This is no ‘alternative’ to HS2.
Finally, we get this old cherry.
“If the counterfactual is the infrastructures more generally, then the first candidate would be fibre and broadband. This would cost less than £100 billion to complete and one of its impacts would be to reduce the need to travel and hence the demand for travel.”
Really? As we’ve had fibre and broadband for many years now, perhaps the professor could say when it’s ever reduced travel demand? Rail passenger numbers are still growing and hitting record numbers. Here’s West Coast operator Virgin trains figures. Virgin has grown passenger numbers from 30.4m in 2012-13 to 38.3m in 2017-18, an increase of 25.98%!
Here’s the statistics for the other West Coast operator, West Midlands Trains. They’ve grown numbers from 60.5 million in 2012-13 to 74.9 million in 2017-18, that’s a growth of 23.8%. So much for broadband reducing travel…
In fact, it’s arguable that improved wireless communication and technology has helped increase, not cut, travel as less and less people are tied to their offices – hence so many people working on trains! OK, next…
“It is hard to avoid the conclusion that the future is more likely to be cars and vehicles than trains”
No, it’s really, really not, this is more nonsense on stilts. High-speed rail is the land transport of choice in the 21st century, which is why so many countries are investing in it. China has built 25,000 km already in just a few short years. Now we have Saudi Arabia, Turkey, Russia and Morocco added to the list. Soon there’ll be Indonesia, India, Thailand the USA and many others.
Like the professor, I could go on, but there’s little point. I think my job here is done. It’s a great shame when academics get so carried away with themselves they trot out stuff like this. I could call it badly-researched, but it’s not. It’s hard not to draw the conclusion that he’s done no research at all.
The weather that is! It’s hardly stopped raining all day here in the Calder Valley. I don’t think I’ve seen the top of the opposite side of the valley as it’s been hidden behind low cloud that’s haunted us all day. I’ve been grateful that I’ve been busy at home as the occasional foray’s I’ve made into the murk have been damp and dismal experiences even though the effort’s been worth it to keep my exercise regime up. That said, the views from the promenade were actually worth seeing today as they were so different.
What wasn’t different was following the news of our political implosion and descent into chaos. Johnson was in Ireland today where he made another of his meaningless speeches. Lite, trite and shite, it didn’t address a single serious issue. Instead it was full of references to ‘hard work’ and ‘opportunities’ – real Unicorn Stuff. His attention seeking antics at the podium also made him the butt of some hilarious memes.
Johnson’s prorogued Parliament today, but not before it’s caused him some more headaches.
Where does this leave the UK? Up shit creek without the proverbial paddle. Our EU friends are running out of patience. They’re far more prepared for a ‘no-deal’ Brexit than we are, because they’ve never lied about the consequences, have prepared in a meaningful way, and they’ll share the pain. Us? Pfft! Many in the UK are still believing in Unicorns and they idea none of this will really happen to us because, somehow, we’re ‘special’. I still overhear pub conversations where folk talk of the ‘will of the people’, completely ignoring the fact we’re three and a half years from the referendum where Leave promises have turned to rat-shit and the demographic’s changed as people have changed their minds – not to mention the way the names on the electoral register have. As someone put it “you mean we’re meant to leave now because that’s what a lot of dead people voted for in 2016?”
Such hubris isn’t going to turn out well. What’s painfully obvious is the complete lack of any plan from Leavers, other than to crash out of the EU whilst blaming the EU. This is going to get messy.
Away from politics, I’ve finished uploading all my Sowerby Bridge rush-bearing pictures to this gallery. There’s a couple of hundred pictures from this last weekend in there now along with rush-bearing pictures going back to 2010 when I first moved up here from London.
I’ve also been busy on the cooking front and tried something different tonight – a Goan Pork Vindaloo. I’m leaving it to steep and fester overnight as these things are like cheese – they need time to mature!
After the fun of rush-bearing yesterday today’s a bit of a come-down. The procession does continue but its focus is more rural and I’ve got other things to do – like edit the hundreds of pictures I took yesterday, as well as houshold chores, cooking and some DIY. It’s not exactly the rock and roll lifestyle, but it keeps me occupied!
That said, so does trying to keep track of the latest iplosions/resignations/floor crossings in UK politics! Today the headlines are all about the latest Cabinet Minister to abandon Johnson’s sinking government. That would normally be extraordinary enough but we live in such bizarre times we also have news that the Prime Minister is allegedly prepared to break the law to deliver Brexit. Meanwhile, the Lib-Dems gain their third defector in a week in the shape of former Labour MP Angela Smith. Truly, the old political party system is broken. Tribal allegiances have been torn apart. Brexit’s broken everything as both Labour and Tories have drifted to the extremes of left and right but neither have any answers to the mess we’re in. All we have now is voices of reason on both sides who cut through the crap and deal with the realities of the situation. Never in a million years would I have thought I’d be on the side of Michael Heseltine and Ken Clark, but that says it all really.
The depressing thing is seeing how many UK citizens are so ignorant of the trouble we’re in. As long as ‘Eastenders’and ‘Coronation St’ are still being broadcast, all’s well in their world. Apparently, we’re British, so we’re immune to all the world’s normal travails. Shit will never happen to us. Only it is and sticking one’s head in the sand isn’t going to help.
On the bright side, I’ve managed to start uploading yesterday’s pictures to the rush-bearing gallery. You can find them here. For now, here’s a couple of samples. I’ve a lot more to add over the next few days.
Today’s the first full day of the Sowerby Bridge rush-bearing festival. A two day annual event that dates back to 1977 when an old local tradition of delivering rushes to churches was resurrected. It’s a day full of fun and a great event to take a camera to -so watch out for pictures throughout the day. Here’s a starter from 2012. Right, I’m off to catch the rush-cart, see you later…
12:47.
It’s been all go so far! I decided to catch the procession in some different locations this year so I walked uo to Warley village and caught the procession at St John’s church, Warley just before they started off. It’s quite a climb from there to their first stop outside thd Maypole pub in the village so I hooe i’ve managed to get some decent pictures. The weather’s been ideal, dry but not too sunny. Here’s a couple of shots I’ve taken on the phone. I’ll add camera pictures later.
Starting off from St John’s church.
Morris dancers performing outside the Maypole pub in Warley village.
Right now I’ve got ahead of the procession ready to get shots of them dropping down into Sowerby Bridge.
15:25.
It’s been a great day so far with a real carnival atmosphere in Sowerby Bridge as the cart goes from location to location. Some of the cart pullers are on their 9th pint by now. Notice the tankards they have clipped to their belts?
17:50.
What a cracking day! The weather got better as the day went on, so the turnout increased. The procession’s now over but the town is absoluteky buzzing. Many of the pubs have laid on outside bars and barbecues so the carnival atmosphere continues. Admittedly, I’ll be calling it a day soon and heading home to sort out today’s pictures, that said, I’ll bet the ‘Bridge’ will be having a busy night tonight. Rush-bearing continues tomorrow but I’ve got domestic things to focus on.
Every year a commemorative leather badge is produced to celebrate the event. You’ll see them on the hats and waistcoats of those taking part. Here’s this years.
I’ve been meaning to blog about this for ages but never had the time. Today’s miserable weather’s put a damper on other photographic activities as it’s chucking it down here in the Calder Valley so I’ve finally found the opportunity.
Some of you may have noticed the old station building at Mytholmroyd as you passed by on the train. It’s on West end of the Leeds bound platform. What you may not have appreciated from the train is just how big a building it is! Here’s how it looked from the platforms in April 2015.
Here’s a recent view showing what it looks like from ground level. In effect it’s two buildings. The back part of the building (to the left of the drainpipe) was the stationmasters residence. The public part of the building is to the right of the drainpipe.
It’s spread over three-floors and there’s a warren of rooms inside. Built in 1871 by the Lancashire and Yorkshire Railway, it was given a grade 2 listing back in 1984 when it was closed by British Rail. It’s been derelict for over 30 years but the friends of Mytholmroyd station have been trying to get it reopened as a community space and waiting rooms ever since 2007. It was a long process as the building is owned by Network Rail. In 2015 the station building was specifically included in the successful Arriva North Franchise Agreement, which stated that (no later than 2025) the franchise shall ” redevelop for social use redundant or under- utilised buildings at stations including Mytholmroyd and Cottingham”.
With that commitment agreed, negotiations continued with various interested parties, including the Railway Heritage Trust. The original group of station volunteers was joined by representatives from the local community and a Northern Rail director; and an application for Charitable Incorporated Organisation (CIO) was granted in September 2017.
The negotiations culminated in work commencing in March 2018 by Network Rail contractors CPMS who removed asbestos and made the building safe in preparation to repoint and plaster parts of the interior. Local interior designers JSB Ltd assisted with the restoration of the original woodwork, fireplaces and windows.
Northern Rail is planning to include the building within
their (operational) station lease from Network Rail. The Station Partnership
and CIO would have a licence from Northern – with no responsibility for
building maintenance etc.
Northern are planning a public Waiting Room and toilet on the second floor with access from the station platform. They would welcome suggestions for a small trading outlet within the building that would be relevant for rail passengers and be suitable for the general community/social use concept.
Northern envisage that the operation of the building will be through a Management Board consisting of themselves, the Station Partnership together with the CIO and users / tenant(s).
Proposals include –
Second Floor – step-free access from the station platform. Welfare
accommodation for Northern Rail staff. A General Waiting Room – which may include
an Art Gallery and station history display. Toilet. Rooms for Railway Education
project.
First floor – steps only access. Studios for local artists
and office/meeting room for Station Partnership, the CIO and the building
Management Board.
Ground floor – step-free access. Flexible use which could include a small trading unit, a Reading Café incorporation of a library, meeting/conference facilities including a small catering area. Secure storage area for the Station Partnership equipment including an accessible water supply.
In March 2019 the first phase of the restoration of the building was complete. In May I was lucky enough to be invited along to have a look inside. Here’s what we saw.
The tour group gather in the booking hall on the ground floor as Geoff Mitchell from the station friends group gives us a run-down on what’s been happening with the building. Looking behind me from the last picture. The wooden structure to the right is the old ticket office. Note the original stone steps leading to the second floor. The restoration work has been done to a very high standard.Here’s the original ticket office desk which was still in-situ. It’s been cleaned and restored. Climbing the stairs from the ground floor. One of the top-floor rooms that have a doorway out onto the platform. This one is on the street side of the building. You can see the way it’s changed uses over the years. Looking to the right of the previous pictures you can see through to the other top-floor room that opens out onto the platform. Some of the original plasterwork and paint colours remain.One of the top-floor stone fireplaces that have been lovingly restored. Another of the fireplaces. None of us could work out what the wooden framework above had been used for. One of the rooms in the old Stationmaster’s residence. One of the winding staircases in the old stationmaster’s residence. This side of the building had been abandoned since the last stationmaster had departed.Shadows and light on exposed brickwork. The ground floor of the old stationmasters side of the building had been altered over the years with one of the walls having been taken out to give access to the exterior hoist up to the Leeds bound platform. Thousands of chickens were shipped through here in the days of the railways being a general carrier. A goods train would pull up at the platform and boxes of chickens would be loaded straight onto it. Now the lift has gone and the doorway’s been bricked up as part of the restoration.A view taken from the yard outside where the lift used to be. The quality of the restoration work is evident. Another relic that remained on the premises. The station safe!
I managed to escape from the office again today as I’d arranged to meet a fellow photographer who works in the rail industry to give him a guided tour of locations around Marsden on the Trans-pennine rail route through the Colne valley. I’d been meaning to update my library shots and get some pictures for a client from the area, so this was the perfect opportunity – especially as the sun Gods were smiling upon us.
Trevor and I met on the train at Huddersfield for a trip on a line that (as a man of Kent) he’d not travelled on for donkey’s years. Our first port of call was Marsden, the nearest station to the famous Standedge tunnels, where canal and rail occupy almost the same ground under the Pennines. It’s a fantastic photo location but one that will change dramatically over the next few years when the rail route is electrified.
The only downside nowadays is the monotony of the type of trains. Very little freight uses the route as it has such an intensive passenger service. This is Trans-Pennine Express’s core route. Northern Rail used to operate an hourly all-stations Huddersfield-Manchester service but it’s now operated by TPE. This means the line’s almost completely Class 185 operated which is why the introduction of the TPE’s loco-hauled sets is a welcome break from the monotony.
Having trudged up the incline to a spot above the tunnel entrance the sun smiled, and so did we, as we managed to get a range of pictures in decent weather. Here’s an example.
A TPE Class 185 heads East towards Marsden station which is around a quarter of a mile to the right of the picture. The bridge in the foreground’s an aqueduct which has been rebuilt and renewed by Network Rail. It’s been raised to give sufficient clearance to the overhead wires which are due in the next few years when the line between Leeds and Manchester’s electrified. A zoomed-in shot from the same location, showing the aqueduct in greater detail. The formation to the right carried tracks through the original single track Standedge tunnels which were built in 1848 and 1871. The present double track rail tunnel was built in 1894. Just behind the train is the Huddersfield narrow canal, its tunnel was opened in 1811. You can learn more about these feats of engineering here. If you’re in the area, I’d recommend the tunnel café and the museum. Both are in the canal basin and a short walk from Marsden station.
Having exhausted the photographic possibilities we changed locations a couple of times to catch one of the new CAF built trains for Northern which was working empty stock from Preston to Huddersfield.
In doing so we missed one TPE’s new Nova 3 sets as we didn’t know the damned thing was running! Here’s the classic view we’d been heading for.
A Manchester bound TPE service approaches the Standedge tunnel. The canal museum and visitor centre I mentioned earlier is in the old transhipment shed to the right of the picture.
By that time the Pennine weather had changed from favourable to fearsome, with cold air and showers sweeping in from the West, so we adjourned to the Riverhead Brewery Tap pub in Marsden, which is a cracking place to stop for a pint before heading back East
Back in Huddersfield we connected with the loco-hauled TPE set we’d missed earlier. Well it would have been rude not to!
Trevor used it to get to Leeds before heading off to Keighley whilst I stayed on as far as York as I couldn’t resist the opportunity to get shots of the set under the magnificent station roof. Luckily, a late-running Siemens set allowed me some nice juxtaposition and a study in front ends.
All in all it’s not been a bad day and a lot less frustrating than yesterday. There’s some useful shots in the bank and for a client. I’ve had chance to explore locations I’ve not visited for a while and I’ve also been able to act as a tour guide for a friend. What more can you ask for?
After two days in the office I’ve bunked off for a few hours. I needed to nip out for some shopping anyway but then I noticed that Northern Rail were running training runs on their new Class 195s between Bradford Interchange and Todmorden. As there’s also a fair bit of freight working today and we’ve got some very moody skies I thought I’d chance my arm and get a few pictures. The results will be in the lap of the Gods as there’s a fair chance heavy showers rather than sunshine will co-incide with the trains, but you never know!
I managed to stay dry walking down into Sowerby Bridge before catching a Northern 2-car 150/2 to Hebden Bridge working a Blackpool North service which is normally the exclusive preserve of their Class 158’s, which suggests that something’s gone pear-shaped with the fleet.
All the way to Blackpool on one of these? Nice…
15:55.
The law of Sod has come into play. No sooner had I landed at Hebden Bridge than I found today’s test runs had been cancelled for no explained reason. On the bright side, there’s still a couple of freight services running but I’m not in the best place for pictures. Ho hum…
16:45.
Well that was a bit of a waste of time! Not a single thing fell right. I ended up heading back to Sowerby Bridge and just for a moment I thought I might be able to grab a shot of ny departing train framed by a gorgeous rainbow – which promptly faded just as soon as the train departed! All that was left was the chance to get a shot of a biomass train heading for Drax power station – just as the next shower arrived! I’ll add a couple of pictures later, right now I’m going to salvage something from the day by getting some shopping and my daily 12,500 steps in…
21:13.
Time to wind things up. Part of me wishes I’d stayed in the office now and ploughed on with other stuff. But as the old saying goes “nothing ventured, nothing gained”. The weather and operations just didn’t fall right. still, here’s a couple of useful photo’s that salvaged the time.
I live the way the Knowsley to Wilton waste train snakes around the reverse curves at Sowerby Bridge. You need a freight train of this length otherwise the shot doesn’t work. Ex- West Midlands Class 150105 pulls into the delightfully period station at Hebden Bridge with a service from Manchester Victoria to Leeds. Note that the unit carries the name ‘Bernie’ under the unit number. I’ve no idea why so I’m hoping a reader may be able to enlighten me.
Whilst I was unlucky with the weather, a friend further East wasn’t as conditions fell perfectly and Tony knew what he was doing to take advantage of them. He should be well pleased with this shot! I’m not jealous really, honest!
Right, I’m now back at home, editing pictures and watching the Tory party implode over Brexit whilst realising that they’ve elected a blustering clown as a Prime Minister. Tomorrow I’m hoping to have a day out with the camera and a colleague. Hopefully both trains and weather will play ball tomorrow…